My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29795
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:43 PM
Creation date
11/21/2007 12:23:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
8/15/2005
Doc Name
Abatement Extension Request
From
Colowyo Coal Company L.P.
To
DMG
Violation No.
CV2004001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
//~ Kennecott <br />~ .Energy <br />Colowyo Coal Mlna <br />5737 State Highway 13 <br />Meake,. Coloeado 81641 <br />Telephone (WO)B24~1552 <br />Fax'. (9]OJ 824-1598 <br />0. Crollln Seod <br />Sr. Enmronmer.[al Engineer <br />August 11, 2005 <br />Mr. Byron G. Walker, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 <br />~~~~~vE~ <br />ails 152005 <br />pivisron of Minercls andeedo6l <br />RE: Request for Extension on Response to NOV No. CV-2004-0Of, from Colowyo Coal Mine, Permit <br />No. C$1-079 <br />Dear Mr. Walker, <br />In response to Colowyo's NOV (No. CV-2004-001), abatement Item 3b of the notice, Colowyo respectfully <br />request an extension of 90 days to allow for the review of the BLM application and CDMG's review of the new <br />plans for the west end of the West Pit. <br />To date Colowyo has submitted a Lease Modification Application to the BLM and copied CDMG. Since then <br />BLM has completed their Environmental Assessment and are working on the engineering and reserve estimate <br />for the modified lease. BLM has hired a new Mine Engineer (Foster Beckett) in the Craig, Colorado field office. <br />BLM representatives Foster Beckett and Rob Enrst have both been out to Colowyo to do a field tour of the <br />proposed lease area and reviewed our geological and mineable reserves. However, since drill hole data was <br />lacking for the specific area in question, additional drill hole information was requested. Colowyo has <br />completed additional drilling within the lease area that has enhanced our modeling of the area. Colowyo then <br />reviewed this new model with BLM representative Foster Beckett, to determine if it will meet their needs. BLM <br />has since told us that they are satisfied with the model and should be able to calculate the mineable and <br />geological reserves. <br />Due to the new modeling data, Colowyo has re-assessed the area for highwall mining potential and has <br />increased the overall tonnage and area to be modified. This will be sent to CDMG in the near future, early <br />September for their concurrent review. <br />In order to ensure there is enough time for both Colowyo and CDMG to review this permit submittal, Colowyo <br />requests a 90 day extension as per the Colorado Mining Rules and Regulations regarding abatement. If you <br />have any questions regarding this matter please call Bob Young. Thank you for your time and attention to this <br />matter. <br />Sincerely, <br />C. Crellin Scott <br />Sr. Environmental Engineer <br />c: File: CF 17.6.4 NOV-2004-001 <br />Bob Young <br />Kelly Sanders <br />Jim Stark <br />Antelope Mme • Colovr/o Mine • Cordem Roio Mine • Jacobs Ranh Mine • Spnng Creek Mine <br />A m=maser o£ .he F.io :into Gxonp <br />
The URL can be used to link to this page
Your browser does not support the video tag.