Laserfiche WebLink
<br />EXHIBIT B <br />Mining Plan <br />The current operator of this clay mine began his operation in 1971. The <br />area mined since 1976 is indicated on the mining plan map. <br />Production quantities for the years 1973-1976 were used to determine area <br />projection required for the mining plan. They are as follows: <br />1973 - 6298 Tons <br />1974 - 3800 Tons <br />1975 - 1585 Tons <br />1976 - 2067 Tons <br />The operator has indicated a projected recovery rate of approximately <br />q <br />y <br />b <br />3440 tons per year. The average overburden is 84% comprised primarily of 1 <br />foot of topsoil underlain by an average of 14.5 feet of sandstone and 34 feet <br />of soft clay. Maximum pit depths are on the order of 35 feet. At the above <br />recovery rate it is projected that one to one and one-half surface acres per <br />year wiil be disturbed. <br />_ .'''~t?ot3req~,i;hz.~~StilY~"ance~of~radd?<:~t~nal r~ <br />.~act~,edgeas..,tho5e~~',re?:'s~oh~p;~oducts~o~jcj ay~jnng,~ No mining of these ma- <br />terials per se has taken place and none have been marketed to date. <br />` 7 <br />:~~~I~?~hr.wii;ll:~~b,~s,~a~,~, y~~~~`pypy'~' A`~emQ/~~{Va~~PP~'yyJJy~ Qi~Y~"s':~anJl~ 'the: stock- ~ <br />.v ~ ,`e~CKiY~i-.y /brfM'i...iY-~'~tl.4.. 4.l1+wr~Y~i..:. 1'. <br />ti '~ <br />;gip;?; ti~~ bil:. Occasional blastin ma be required to break up a <br />'. ~~,. 9 Y <br />sandstone cap before it can be removed and stockpiled for later use as fill. <br />~•T'~t~s~anticpated~;~hat;thev~stock out area. for topsoil.can be: established iq; <br />pre~vaopsly,-mine~sare~s;~ The clay will be excavated to an approximate maximum <br />depth of 35 feet by front end loader which places the material in dump trucks <br />for delivery to a processing site in Flcrence operated by Colorado kefractories <br />Corp. No water usage is anticipated at the mine site and little surface or <br />ground water is retained except for short periods after heavy rains. <br />