My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29765
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29765
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:42 PM
Creation date
11/21/2007 12:22:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/15/1992
Doc Name
BEI ENGINEERS CONSTRUCTION
From
T C SHUTT
To
LARRY OEHLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HF'R 16 '92 11~.~Rhl <br />i <br />MEMORANDUM <br />T0: BMO, San Luis <br />FROM: T.C. Shutt -rrS <br />DATE: April 16, 1892 <br />SUBJECT: Addendum to Chemical Analytical Matrix <br />F.6 <br />I am hoping that we now have the final design for the chemical analytical matrix. <br />I met with MLRD personnel (15th April) and discussed our matrix d sign (of 14th <br />April). Their suggestions have keen incorporated into the attached matrix (dated <br />16th April) and include the following additions: <br />1. Once a week take a sample from the collector pond and anal ze for total <br />cyanide and WAD cyanide. <br />2. On the Monday and Wednesday samples (which are also tested by outside labs) <br />also analyze the collector pond sample for WAD and Cu. I <br />This matrix (18th April) will be reviewed one more time by MLRD bel4are they give <br />us final approval. <br />After discussions with Blaine Olson, I believe that I should explai~ (to clarify) <br />a few points in the analytical matrix. <br />1. The "As is" samples taken on Monday and Wednesday, need anal zing for free <br />(CN)~ SiD..IX• <br />2. The "pH Adjusted" should be fully analyzed according to thematrix. <br />3. The "As is" samples shall be taken on Wednesday, 15th Apr11 already done) <br />and Monday, 20th Apr11 only. After that e11 samples taken n Mondays and <br />Wednesdays shall be "pH Adjusted" only. In other words - dr p the "As is" <br />sampling on Wednesday, 22nd Aprit. <br />4. When analyzing the Monday and Wednesday samples (on Wednesr~ay and Friday <br />respectively) the pH and free (CN)~ pust be analysed on the collhrect day; the <br />WAD and metale can be measured later if you run out oP time <br /> <br />~/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.