Laserfiche WebLink
• CIRCES Cost Estimating Software <br /> EQUIPMENT MOBILIZATION I DEMOBILIZATION <br /> PROJECT IDENTIFICATION <br /> Agency or grga izabgn name'.DMG <br /> Task# 004 State:Cokredo PennNob N.M-1986-165 <br /> Data 09120/2" County:La Pisa Abbrenation:none <br /> User: no Site.Willow Bend R'1 Filename:U165-004 <br /> Permit or other job action.Final Reclamation-Scheduled Bond Renew <br /> Task description.MoBlll=e reclamation equipment to site <br /> EQUIPMENT TRANSPORT RIG COST Shin basis. f pa'dey <br /> Cost data source. CRG Data <br /> Truck tractor descnpbon Generic w4ughway,buck bacb>,6x4,diesel powered,400 HP <br /> Truck traler descnpbon Generic folding gooseneck drop deck a Iupmsnf bailer(257.WT.and 907) <br /> Awilable ng"pacifies 0.25 Tons 2650 Tons 51i Tans <br /> Cost Breakdown Ownership costrhour S23.05 $25.40 S29.25 <br /> Operating costlhour $2662 S2831 $30,98 <br /> Operator cosUhour: $2261 $2211 $22.61 <br /> Helper coaf/houc $000 if <br /> 82 S21.82 <br /> Total Und Cestlhour' $72.28 $98.21 s115e.67 <br /> NON­FtOAOABLE EQUIPMENT <br /> Machine Waghtfunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permi <br /> DewHPBDn (Tons) Cosndunit Cos9hdunit (No.uni6) Cost/hrfiest CosdhrRleet Cost'lleet <br /> -Cat D7H Saes 2(1996) 30.41 S3589 398.21 1 $iJ4.10 $9821 saw <br /> -7reclo-Reyegel 800 S1000 S7228 1 $82.28 $72.28 saw <br /> -TrecM.4,evega2 800 51000 $72.29 1 S8226 $12.28 $000 <br /> ATV wesdspmy 01 1w S5.00 $72.28 1 $77.28 $72.28 $000 <br /> ATV weed spray#2 1.00 $500 $7226 1 $77.28 S7228 $0.00 <br /> subbotalr. $463.22 $387.33 si <br /> ROADABLE EQUIPMENT <br /> Machine Total Fleet Size Haul Trip Rehm Trip <br /> Descnpbon Cpatfhourlunit (No unib) C.Whrllleet Cosdhd6eet <br /> subtotals: t0.W saw <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region: Durango,Cc <br /> Transportation Cycle rnn. Non- Total one-way travel distance: 5.0 miles <br /> R"dable Roadable Average travel speed: 350 mph <br /> Equipment Eiluipment <br /> Haul bms(hours)= 0.14 0.14 Total non.roadable mcNdemob=0': Sf,14659 <br /> Retum time(hours)= 0./4 014 'no rvv4 trips+ie,Nil no <br /> Loading bme(hours)= 0 W NA Total roadable moNdemob cost $0 w <br /> Unloading time(hours)= 050 NA mmw repro Drip <br /> Subtotals= 129 0.29 w. FyY.u <br /> JOB TIME AND COST +ern Total job time: 2.57 hours <br /> Total job cost' S1,147 <br />