My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29648
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:37 PM
Creation date
11/21/2007 12:19:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Enforcement
Doc Date
4/6/2006
Doc Name
Board Order
From
MLRB
To
Colorado Marble LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Section 34-32.5-116(4)(j) of the Act requires operators to implement reclamation plans in a <br />way that stabilizes and protects all surface azeas of the affected lands to control erosion. <br />8. Section 34-32.5-124(6)(a) of the Act states that the Boazd may suspend, modify or revoke a <br />permit if, following a hearing, the Board determines that a violation of a permit provision <br />has occurred. <br />9. Section 34-32.5-124(7) of the Act states that persons who violate a permit provision shall be <br />subject to a civil penalty of not less than $100.00 per day nor more than $1,000.00 per day <br />for each day during which a violation occurs. <br />10. Based on the Division's recommendation, it is appropriate for the Boazd to. find a violation <br />of Sections 34-32.5-116(4)(1) and (j) and Construction Materials Rule 3.1.5(3) for violating <br />a permit provision, specifically for failing to protect areas outside of the affected ]ands from <br />slides and damage and failing to stabilize affected ]ands to control erosion. The Board has <br />already suspended the Operator's permit. <br />11. Based on the Division's recommendation, it is appropriate for the Board to assess civil <br />penalties against the Operator in the amount of $1,000.00 per day for 43 days, calculated <br />beginning October 4, 2005 (the date of the site inspection) through November 16, 2005 (the <br />first available hearing date). It is appropriate to take into account that the Operator has <br />submitted a conversion application to the Division, as requested in prior Boazd orders, and <br />has posted a bond in the amount of $282,000.00, as requested in prior Boazd orders. It is <br />appropriate to suspend a certain portion of the civil penalties if the Operator complies with <br />Boazd-ordered corrective action in a timely manner. If the Board determines that civil <br />penalties already assessed against the Operator for violations of the Operator's permit aze <br />adequate, it is appropriate to decline to assess additional civil penalties. <br />Colo. Marble Feb. 06 I, M-1987-028 <br />
The URL can be used to link to this page
Your browser does not support the video tag.