My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-25_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-25_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 10:54:03 AM
Creation date
11/21/2007 12:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/25/1990
Doc Name
REPORTERS TRANSCRIPT OF PUBLIC HEARING TESTIMONTY OF PHILIP HOCKER
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />15 <br />1 1 groundwater level and this uncertain barrier which <br /> 2 the Battle Mountain Resources is placing below a <br />' 3 tailings deposit of uncertain composition. <br /> 4 I think the public deserves better <br />' <br /> 5 protection than that. I believe you are obligated <br /> 6 under 3432116-G to look at groundwater gL4ality <br /> 7 protection. And I don't believe this liner, as <br />' 8 proposed, gives you an adequate level of assurance. <br /> 9 This is a solvable problem. There are <br />' 10 several solutions which I would propose. Whether <br /> 11 carrying out these solutions makes this a~ desirable <br /> 12 question is a different question and I aa~. not <br />' 13 rendering judgment on that. But I think you should <br /> 14 require looking at a double liner with a drainage <br />' 15 netting in between and leak monitor and detection in <br /> 16 that area. <br />' 17 I h <br />c <br />ult <br />d with <br />f th <br /> ave <br />ons <br />one o <br />e <br />e <br />' 18 preeminent liner manufacturers in the country and am <br /> 19 told that the additional cost for this area would be <br />' 20 -- that is, to add this, given everything else <br /> 21 that's already in place in terms of grading and <br />' 22 liner, would be approximately $2 million. <br /> 23 Secondly, I think that you should <br /> 24 consider requiring either hydrogen peroxide or <br /> 25 some other form of backup decontamination, in case <br />AGREN, BLANDO & BILLINGS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.