My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-20_REVISION - M1986160 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986160
>
2006-11-20_REVISION - M1986160 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 12:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986160
IBM Index Class Name
Revision
Doc Date
11/20/2006
Doc Name
Reclamation Liability Update - 2006
From
DRMS grm
To
Sunnyside Gravel Mine
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : 11/20/2006 <br />User : GRM <br />State :Colorado <br />County :Mesa <br />Site : Sunnyside Gravelmine <br />PermiUjob # : M-1986-160 <br />Abbreviation :none <br />Filename :M160-02a <br />Agency or organization name :DRMS <br />Permit or otherjob action :Reclamation Liability Updai <br />Task description :rip compacted pit /loon <br />HOURLY EQUIPMENT COST <br />2006 <br />Basic machine :Cat D8R Series 11 - 8U (2005) <br />Blade type :Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2 1-shank ripper <br /> Utilization <br />Cast Breakdown : Ownership costlhour : $59.12 NA <br />Dozer operating costlhour : $74.00 100 <br />Ripper operating cost/hour : $8.51 100 <br />Operator costlhour : $32.78 NA <br />Total unit costlhour : $174.40 Total fleet costlhour <br />MATERIAL QUANTITIES <br />$174.40 <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 5.00 acres Rip depth (ft) <br />Source of estimated quantity :accepted volumes <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />NA feet/second <br />NA cu. yds./hour <br />1.50 feeUpass <br />5.56 feeUpass <br />250.00 feeUpass <br />88.00 feeUminute <br />0.25 minutes/pass <br />0.619 acres/hour <br />1,499.02 cu. yds./hour <br />1 dozers) <br />$0.140 per cu. yd. <br />NA Bank volume : <br />1.50 Volume : NA <br />12,100 BCY <br />BCY or CCY <br /> <br />~ Condition Correction Factors - <br />Unadjusted production <br />per selected method : 1,499.02 cu. yds./hour <br />Site altitude : 5,800 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 1,244.19 cu. yds./hour <br />Adjusted fleet production : 1,244.19 cu. ytls./hour <br />Total job time : 9.72 hours <br />Total job cost : $1,696 <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.