Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />Date : 20-Nov-2006 <br />User : GkM .~ <br />Agency or organization name :DRMS <br />Permit or job action : Rectamation <br />ICT r 19C/~T /~/~CTC\ <br />CIRCES Cost Estimating Software <br />*;<*' COST SUMMARY F072M ;~ ''~''`~~'~°` <br />Permit or job no.: M-9'988-960 '~ Site'6{~'trnnyside Gravel Mine ~ <br />Abbreviation : none State :Colorado __ <br />Filename: M160-000 County:Mesa <br />2006 <br />Cll~~,l ICI CCT TACV i rIIOCr`T <br />NO. TASK DESCRIPTION USED SIZE I; HOURS ~ COST <br />01a -rip outcrop of conglomerate for final grading ~ dozer 1 0.4~' S79 <br />02a -rip compacted pit floor ~ ripper 1 9.7 _ _ $1,696 <br />03a -push ripped conglomerate to slope toe dozer 1 0.74 1 $125 <br />04a -push overburden /topsoil down on graded slopes ~ dozer 1 11.44 $1,947 <br />O5a -revegetation of 9 acres revege 1 24.0 $9,842 <br />O6a -initial mobilization to site mobilize 3 6.0 $1,678 <br />07a -secondary seeding mobilization mobilize 2 5.5d $658 <br /> I <br /> - <br /> <br /> <br /> <br /> <br /> <br /> <br /> ..' <br /> d11 <br />' <br /> ,• <br />1•.\ , <br />•: <br /> 3nri -~ ~ - <br /> <br /> <br /> <br /> <br /> I <br /> <br />suaTOTALS: 57.8 $16,025 <br />includes inFlation factor adjustment of <br />NA <br />TOTAL DIRECT COST • = $16,02$ <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Liability insurance : 2.02 % o(direct total = $324 <br />Performance bond : 1.05 % o(direct total = $768 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct _ <br />total = $1,602 <br />not required (or eqp. operator serves as super ) <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />conhngencies accounted for at task level <br /> TOTALO&P= $2,094 <br /> CONTRACT AMOUNT (direct+O&P)= $1$,779 <br />500.00 total $ NA total = $500 <br />NA NA NA total = NA <br />5.00 % of cntc NA total = $906 <br />NA` NA total = NA <br /> TOTAL INDIRECT COST= $3, $OO <br />TOTAL BO ND AMOUNT (direct+ indirect) _ $19,$25 <br />