My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29451
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:28 PM
Creation date
11/21/2007 12:16:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
7/25/1997
Doc Name
NOV CODING FORM
Violation No.
CV1997010
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV CODING FORM <br />[C] VIOLATION NO. <br />[C] MINE OR EXPLORATION ID NO. <br />CATEGORY OF VIOLATION <br />[C] INSPECTION DATE <br />VIOLATION TOPICS <br />[C] PRQv1ARY TOPIC M P <br />C -9 7 -0 1 0 <br />C -8 0 -0 0 7 - <br />V <br />0 7/ I 5/ 9 7 <br />SECONDARY TOPIC S F <br />III IIIIIIIIIIIII III ,~td <br />TERTIARY TOPIC _ _ <br />AD = ADMINISTRATIVE RD = ROADS <br />AP = AIR RESOURCE PROTECTION RS = RECLAMATION SUCCESS <br />AR = AVAILABILITY OF RECORDS RV REVEGETATION <br />BG = BACKFILLING AND GRADING SB = SUBSIDENCE <br />CR = CONTEMPORANEOUS RECLAMATION SC = SEDIMENT CONTROL <br />ES = EXCESS SPOIL AND DEV. WASTE SD = SLIDES AND OTHER DAMAGE <br />EX = EXPLOSIVES SF = SUPPORT FACILITIES ON SITE <br />FW = FISH AND WILDLIFE SM = SIGNS AND MARKERS <br />HB = HYDROLOGIC BALANCE SN = SUPPORT FACILITIES, NOT ON SITE <br />HM = HYDROLOGIC MONITORING SP = SPECIAL CATEGORIES OF MINING <br />MP = GENERAL COMPLIANCE WITH PLAN TS = TOPSOIL <br />PW = PROCESSING WASTE OR = OTHER <br />DATE ISSUED _ 7 /2 5 /9 7 <br />DATE OF ON-SI TE HEARING / / <br />VIOLATION DESCRIPTION <br />Failure to obtain re ug latory approval for mine site costruction activities includine <br />sienificant excavation of previously undisturbed areas prior to initiative construction. <br />(50 Spaces) <br />ABATEMENT DIJE DATES SEPARATE ABATEMENT DESCRIPTIONS <br />0 7 / 2 5 / 9 7 (11 Cease all unapproved activities at the Material StoraPe Bench Area. <br />0 8 / 2 5 / 9 7 (2) Obtain approval for all unpermitted construction activities at the Material Storage Bench <br />/ _ _ / _ _ Area prior reinitiating construction. <br />(50 Spaces) <br />NOTE: [C] =Required entry for all Notice of Violation Records <br />OPERATOR NOTE: Enter "Nature of Violation" narrative on opposite side into "Narrative Edit" screen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.