My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29375
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:24 PM
Creation date
11/21/2007 12:14:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
6/8/1993
Doc Name
Request for extension
From
ENERGY FUELS COAL INC
To
DMG
Violation No.
CV1993047
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />~'~ r energy fuels coal, inc. ~! <br />one labor center • suite 2500 r~ e~~~\/gyp ~ ~303~ 623-8317 <br />t 200 seventeenth sireel • denver, Colorado 80202 T~F '.Iwx 9t 0-931-2561 <br />June 3, 1993 ,UN $ 993 <br />Mr. Joseph J. Dudash <br />Division of Minerals and Geology iryivisiet~ ctt w~lln°t~15.6yu.11c1~y <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 !~ <br />Re: Energy Fuels Mining Company -Raton Creek Mine (Permit No. C-82-055) <br />Abatement Response for NOV C-93-47, Pond Certification <br />Dear Mr Dudash: <br />Due to unexpected setbacks, Energy Fuels Mining Company (EFMC) resppettfull i requests an <br />extension of the abatemen[ date for the part of NOV C-93-47 dealing wi[h pond certtfication. <br />NOV C-93-47 was written for: <br />Failure [o main[ain copies of all records, reports and information required by the <br />regulations at a convenient place in the area of mining. Specific information <br />apparently no[ on file a[ [he mine office includes quar[erly refuse inspections, an <br />updated sedimen[ pond certification, a Curren[ certificate of public liability <br />insurance, and a haul road certification. <br />The steps necessary to abate the violation are specified to include the following actions: <br />Ensure current engineering certification for the sediment pond, refuse pill and <br />haul roads, and a current certificate of insurance are submated to the Diiis[on <br />and pplaced on file a[ the mine office. An alterna[ive to submittal of haul road <br />certification can be submittal of a revision to re-classify the haul road. <br />In response to the requirement for pond certification, EFMC con ratted a registered land <br />surveyor (Mincic Surveying) to survey the pond. After reviewing the survey, discrepancies were <br />noted between [he existing pond and pond designs. EFMC is to the process of reviewing the <br />pond design and developing required modifications to address these discrepancies. OO n or before <br />June 25, 1993, EFMC will submit a Technical Revision (TR) detailing any required changes to <br />the pond design. <br />Upon approval of *.he-pcnd designs, EF&iC ~•ill-make all required modification, io the word. <br />During and upon completion of modifications, the pond will be inspetted and certifiedrby a <br />Colorado Registered Engineer. I <br />This abatemen[ approach should effectively address the part of NOV C-93-47 dealing with the <br />need for a pond certification. Please feel free to contact me if you have any questions or require <br />clarification relative to the abatement approach. We appreciate your consid~ieration and <br />assistance. i <br />Sincerely, ss <br />C •~, <br />~o- Allen S. Weaver <br />Mine Engineer <br />cc: A. Weaver ~~ <br />R. Acre ~ <br />P. Goldsmith <br />
The URL can be used to link to this page
Your browser does not support the video tag.