My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-27_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-27_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 11:01:35 AM
Creation date
11/21/2007 12:13:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/27/1990
Doc Name
DIRECT COST SUMMARY
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION ESTIMATE FORM <br />TASK NO. DATE PREPARED BY PERMIT NO. <br />PERMIT ACTION <br />HOURLY EQUIPMENT & HAUL UNIT COSTS <br />Equipment Transport Rigs: Labor Zone <br />Light Equipment Rig (for equipment weighing up to 3 <br />Ownership cost/hr $ + operating cost/hr $ <br />+ helper cost/hr $ _ $ /hr Total <br />Heavy Equipment Rig (for equipment weighing over 35 <br />Ownership cost/hr $ + operating cost/hr $ <br />+ helper cost/hr $ _ $ /hr Total <br />i tons GUW): <br />+ driver cost/hr $ <br />Rig Cost <br />tons GVW): <br />+ driver cost/hr $ <br />Rig Cost <br />Equipment Used on Job: ,~ <br />use . f /f <br />~ Machine Equip. Ownership Equip. Haul Rig Fleet Size Mob./Demob. <br />Description Cost/hr Cost/hr (no. hauled) Cost/hr <br />~9(r GR~pe 2 $ SJ~ + $ x ~ _ _ $ <br />fl~N $ ~,~ $ x 6 _ _ $ <br />$ + $ x _ = S <br />$ + $ x _ _ $ <br />$ + $ x = $ <br />$ + $ x _ _ $ <br />$ + $ x _ _ $ <br />$ + $ x _ _$ <br />Total Project Mob./Demob. Cost/~r = $ <br />EQUIPMENT HAUL DISTANCE & TIME <br />Major population canter within project area region <br />Total distance = miles, average speed in miles per hour = <br />Job time: hrs load + hrs haul + hrs unload + __hrs return <br />= total hrs x 2 trips = hours total moh./demob. time <br />JOB COST <br />hrs x $ _ $ ~~ `/ ~'O Total Job Cost <br />Total mob./demob. time Total project mob./ <br />demob. cost/hr <br />NOTE: Depending on the job ]ayout and reclamation requirements, it may be necessary to <br />mobilize/demobilize additional equipment at some future point in time after com- <br />pletion of initial reclamation work to perform sediment pond/d'version ditch final <br />reclamation and any necessary reseeding work due to initial seeding failures. <br />Costs far transporting appropriate equipment to and from the job site to perform <br />such follow-up work should be included in the mob./demob. estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.