Laserfiche WebLink
GIRCES Cost Estimatinu Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task # : 111 State :Colorado <br />Date : 10/>272007 County :San Miguel <br />User : RCO Site :Sunday Mine <br />sheet 1 of 2 <br />PermiUjob # : M-1977-285 <br />Abbreviation :none <br />Filename : M285-111 <br />Permit or other job action :Amendment 2 <br />Task description :Haul reclamation equipment to and from site (for 5 new vent shafts ar <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tans 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> OperatingcosUhour: $44.38 $46.13 $50.07 <br /> Operator cost hour : $27.66 $27.66 $27.66 <br /> HelpercrosUhour: $0.00 $25.39 $25.39 <br /> Total Unit CosUhour :~ $88.67 $117.55 $125.45 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D7R DS Series /l - 7SU 35.17 $41.70 $117.55 1 $759.25 $117.55 $0.00 <br />-Cat 315C L 18.63 $22.91 $88.67 1 $111.58 $88.67 $0.00 <br />-Reveg equipmt 5.00 $12.00 $88.67 1 $100.67 $88.67 $0.00 <br />Subtotals :I $371.60 I $294.89 I $0,00 <br />