Laserfiche WebLink
J ~ <br />Mr. Cazl Mount <br />Octobez 29, 1990 <br />Page 2 <br />In addition, the other items identified in your <br />August inspection report have been completed. <br />Most notably, additional topsoil was hauled to <br />the Snake Pit area (mining area No. 2) to cozxect <br />a deficient topsoil depth. The Snake Pit area <br />was then seeded with the permanent seed mix and <br />mulched. <br />If you have any fuxthez questions, please contact <br />Fred Fest. <br />Respectfully, <br />i~ I(1/, <br />James S //Lunan <br />.~ Managez, Permits <br />jdc <br />