Laserfiche WebLink
Step 8: 30 October 2006 Continue CPDS sampling and reporting. <br />Step 9: 30 October 2006 Re-establish all DRMS-approved sediment control systems. <br />Step 10: 11 December 2006 Submit as-built for the cleaned Sedimentation Pond E <br />Step 11: 11 December 2006 Report, in writing, completion of Foidel Creek cleanup. <br />NOTE: [C] =Required entry for all Notice of Violation Records <br />OPERATOR NOTE: Enter "Nature of Violation" narrative on opposite side into "Narrative Edit" screen. <br />(50 Spaces) <br />