My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29174
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:15 PM
Creation date
11/21/2007 12:10:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
7/3/2002
Doc Name
(Faxed) Abatement Letter for the Nov
From
Greystone Environmental Consultants Inc
To
DMG
Violation No.
CV2002008
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Kent (}orham <br />July 3, 2002 <br />Page 2 <br />completed. As this modification was not within. Basin's control, Basin requests that this <br />point of the NOV be vacated. <br />Failure to collect one annual water quality sample for GEM 2 -See explanation presented <br />for item 4 above. Basin requests that this point of the NOV be vacated. <br />Failure to collect one oftwo semi-annual field measwemems for GEM-2 •-See explanation <br />presented for ilern 4 above. Field measurements presented in the 2001 hydrology report for <br />GEM-2 during the May 2001 sampling was the data reported for GEM-1. A revised data <br />table for GEM-2 is attached for replacement in the report. Basin requests that this point of <br />the NOV be vacated, <br />In the future, Basin will complete the following steps to ensure that all samples are collected and the <br />appropriate analyses are conducted in the lab: <br />1. Basin will utilize the tables in the Permit as a checklist when sampling is conducted and in <br />completing the Chain of Custody identifying the analytical list that is sent to the Iab. <br />2, Basin will ensure that Williams modify the shaft opening at GEM-2 to allow bailer access <br />for sample collection. <br />3. Basin will send all sampling results to Greystone as they are wmpleted for a QA/QC check <br />to ensure all necessary samples have been collected. <br />4. Basin will include Greystone on the distribution list of results tiom the Iab to complete a <br />QA/QC check to ensure till necessary analyscs have been completed, <br />5. Basin will submit a summary of sampling to the Division on a quarterly bases to show that <br />all analyses are being completed as required, Phis information will also be included in the <br />records at the mine site so CDMG inspectors may examine it during the quarterly records <br />review, <br />Should you have questions or need additional information concerning the abatement of this NOV, <br />please do not hesitate to cal] Mr. Ron Thompson or let me know. <br />Sincerely, <br />~ ~~ <br />Terry Fl. xoblitz <br />Principal <br />CC Mt. Ron'1'hompson -Basin Resources <br />4/t: 3Jtld ~Wd05~Z ao-e-~nr `•t'6t0 6B9 EOE `•1tl1N3NINOklIAN3 3NO1SA3tl0 ~h8 1N3S <br />
The URL can be used to link to this page
Your browser does not support the video tag.