My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29129
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:13 PM
Creation date
11/21/2007 12:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
10/12/1993
Doc Name
BATTLE MTN RESOURCES INC BMRI SAN LUIS DMG PN M-88-112 RECLAIM TANK OVERFLOW LINE
From
BATTLE MTN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MTN. GOLD SL ID~719-672-3363 <br />OCT 14'93 13 51 No.019 P.02 <br />A water sample was Collected from the overflow water onded <br />in the mill area. The Division received a split of t is <br />sample. The sample was shipped to Core Laboratories or <br />cyanide (total and wad) analysis. The final analysis report <br />showed the cyanide concentrations to be below groundw ter <br />and drinking water standards, 0.16 ppm CN-wad and 0.1 ppm <br />CN-total (see attached report). <br />Four soil samples were collected of the clay where th~ <br />overflow water ponded within the tailings disposal ar a. <br />Also, two soil samples were collected where the overf ow <br />water ponded in the mill area. The samples were ship ed to <br />Core Laboratories for cyanide (total and wad) analysi The <br />analysis reports will be submitted to the Division. <br />Although elQVating and moving the line was a one time event <br />specific to the tailings construction project, BMRI h s <br />taken additional pre-cautions against similar situati ns in <br />the future. The reclaim line is being relocated such that a <br />constant l~ grade from the tank to the tailings facil ty <br />will be maintained to allow the line to free-drain to tails. <br />Thus, reclaim water will not be able to move back up he <br />line to the mill area. Also, a policy o£ locking out the <br />reclaim pumps while work on the reclaim tank overflow line <br />is being performed has been established. Each time w rk is <br />performed on the line, the line will be walked to ins ect <br />outer pipe couplings. <br />If you have any questions, please call. <br />Sincerely, <br /> <br />Alana L. Scott <br />Environmental Engineer <br />EAClosure6 <br />cc: Anne Haldrige <br />Ken xlukedahl <br />Chuck McDonald <br />Larry Newcomer <br />Mike xounq <br />
The URL can be used to link to this page
Your browser does not support the video tag.