Laserfiche WebLink
SAN LUIS MINE TIMELINE <br />11/9/96 Cessation of Milling operations, begin mill closure <br />11/25/96 Discovery of corrosion in leach tanks #5 and #7 and <br />immediate verbal and written notification to DMG <br />12/13/96 Inspection of tanks by DMG <br />12/20/96 DMG receipt of concern letter from CCES <br />12/30/96 First set of BMRI and DMG samples taken at one foot <br />depth in each tank <br />1/10/97 Second set of DMG samples taken at one foot depth in ~ <br />each tank <br />1/24/97 Samples taken to four foot depth in four locations <br />1/30/97 Samples taken from edges of tank <br />