Laserfiche WebLink
0 <br />— V� Ow'— <br />y <br />DITCH WATER RETURN �'•� <br />/ (SEE NOTE 2) <br />OHU-- Q4Hg1IH— OYM/ --- OiMH— ONIH— ONU-- OHIF -- 01NF— 011l�— om I -- O"U-- O"I — OHU— OHI <br />EXISTING ACCESS ROAD <br />OPTION 1 TO BE MAINTAINED <br />SEDIMENT PONDS OPTION 2 <br />DISCHARGED TO SEDIMENT PONDS <br />LUPTON BOTTOMS DITCH DISCHARGED TO <br />"•,� _ (SEE —NCTE 5) <br />2 19— PLATTE RIVER <br />\�( 25 30 (SEE NOTE <br />OHU M4,— mu OHU-- ON 0�1 OHU— OHU— OHU— OH <br />/ ar x / <br />/ \/ / PROPOS�S <br />\\ <br />POWER DI <br />H— OHU— OHU� / OHU— OH U— 01 <br />OHU— OHU OHU— OHU- <br />u <br />/ ,�' �& N'G�i ,`� , y7— r r T r �1 / PROPOSED \ _ <br />1 , r „� I , i r , —„ I L,,, 2500 GPM <br />r Bff dE�%JAfEFtEfJ F` L \ <br />1 ftl� { a%fACt L�NS`U�O L , • ; : c L , y J , _ I \ WELL SITE <br />✓ERBURDE 1 �.�1 I� ti p p— p 1 1\ <br />STOCKPIL <br />OVERBURDEN::: I I 1 1 1 <br />,1 r GGREGATE 1 d l PROPOS D 24" <br />I� i PILE STOCKPILE <br />i FILL PIP I w 1 <br />EXISTING ( ;, �! I I > <br />�OTSEEE� ,. EXISTING DISTURBED i� I TOP SOIL I <br />SCALE <br />AREA ��� EXISTING I I STOCKPILE I I <br />DISTURBED HOUSE <br />I / EXISTING AREA I IVl �(Jl I I I I <br />MINING LIMITS <br />�i EXISTING LUPTON �� PLANT <br />BOTTOMS DITCH / IO <br />/ <br />(SEE NOTE 2) I (SEE NOTE 1) <br />MATCH EXCAVATION <br />/ I i EXISTING ACCESS / TO EXISTING PIT FLOOR , \> > , f i r I 10 ER EN <br />\rr / / J <br />/ J i ROAD —!' i l l AGGREGATE I I TOCK I _E <br />, PILE I 1 / <br />" -� SEE NOTE 4) I I / <br />., r.: ......- I <br />EXISTING POND �r rl l r r 1 "r) 1 / <br />I � I <br />I <br />/ <br />GAS <br />L / <br />/ Z <br />T BED F IN <br />� EWATERED LOW G <br />I <br />r <br />r <br />'SLURRY Y WALL CONST UCTION <br />I <br />r � � r F T I <br />r ,, I I / <br />�r'r r , , r <br />/ WETLANDS ,.r ,, ry," r rrrA I I <br />, rrr r <br />/ l / <br />;i r 1,, ))L,! l, r r r I I <br />' IPRESERVATION, � �� - � <br />UPTON BOTTOMS <br />/ ENHANCEMENT, ITCH NO. 1 r 1 '' , 1 6 i <br />/ MENDE[1 x r "> <br />NO MITIGATION OVERBURDEN , �' r r r r r" r' r <br />AREA s5 �rrr PT ,' As )AM' N If�Ci Jrf rr I I f \ l <br />STOCKPILE / _ �. I <br />i (APPROIT. � AIPPROX. LIMITS,' <br />8� 3 TOTAL A�NR E <br />10 <br />Y _ / <br />�— —G— <br />—r,r_. ,r -� �;t A ES) �� I r fr <br />41 <br />L <br />/ SEE NOTE <br />IVERT DITCH - <br />0,0— ONU—_. ONU _ I — — — \ — _ i'� D RING MINING <br />— — — — — — — — — a«r _ — — "- �., ,,.i �S _tE—NOTE 2) <br />oxw__ <br />' au` _ <br />LUPTON BOTT MS ` I <br />DITCH BRANCH <br />r <br />r <br />WETLANDS I I I ! <br />PRESERVATION, 1 1 1 I <br />ENHANCEMENT, AND \ l o l <br />MITIGATION <br />)"30 <br />GRAPHIC SCALE <br />( IN FEET ) <br />1 inch = 200 ft. <br />TYPICAL CROSS SECTION OF PIT EDGE <br />SCALE: 1" =200' <br />RESERVOIR SLURRY <br />WATER SURFACE TOP OF WALL <br />CUT (30 ") <br />(SEE NOTE 6) PERMIT <br />CONCURRENT BOUNDARY <br />BACKFILLING AT <br />3:1 SLOPE <br />BASE OF USING <br />RESERVOIR OVERBURDEN <br />FROM SITE <br />III III III I _.III III III III III 'III <br />II III III III II III III III III Ilf 111 <br />I III III III I III III III- III III :III <br />III IF . , I I I I I I I I I I I I I I I I I I I I I I l l I <br />iii —iii III II Ili lil III III Ilf_III <br />v <br />;� <br />/ \ BACK FI LL GROUND GROUND <br />/ III III I :III II III III I <br />I I I III I III III -III III III- III- <br />`'' <br />/SHALE BEDROCK' <br />SLURRY WALL <br />KEYED INTO <br />SHALE MIN. 3 FT. <br />PL <br />PROPERTY LINE \PERMITTED AREA <br />— — — — — — <br />PROPOSED MINING LIMITS <br />SECTION LINE <br />— — <br />EXISTING MINING LIMITS <br />WATERWAY <br />DITCH <br />— OHU— OHU— ON'] — OHU— <br />OVERHEAD UTILITY <br />— cis — <br />UNDERGROUND GAS LINE <br />UNDERGROUND FIBER OPTICS CABLE <br />SLURRY WALL <br />UNPAVED ROAD <br />----- - - - - -- <br />EASEMENT <br />r <br />�— <br />EXISTING INDEX CONTOURS <br />®OIL /GAS <br />OIL /GAS WELL <br />AMENDED MINE AREA <br />''/ <br />AGGREGATE STOCKPILE <br />TOPSOIL STOCKPILE <br />1 <br />I <br />1 <br />1 <br />1 <br />1 <br />1 <br />, <br />1 <br />1 <br />EXISTING ACCESS ROAD <br />OPTION 1 TO BE MAINTAINED <br />SEDIMENT PONDS OPTION 2 <br />DISCHARGED TO SEDIMENT PONDS <br />LUPTON BOTTOMS DITCH DISCHARGED TO <br />"•,� _ (SEE —NCTE 5) <br />2 19— PLATTE RIVER <br />\�( 25 30 (SEE NOTE <br />OHU M4,— mu OHU-- ON 0�1 OHU— OHU— OHU— OH <br />/ ar x / <br />/ \/ / PROPOS�S <br />\\ <br />POWER DI <br />H— OHU— OHU� / OHU— OH U— 01 <br />OHU— OHU OHU— OHU- <br />u <br />/ ,�' �& N'G�i ,`� , y7— r r T r �1 / PROPOSED \ _ <br />1 , r „� I , i r , —„ I L,,, 2500 GPM <br />r Bff dE�%JAfEFtEfJ F` L \ <br />1 ftl� { a%fACt L�NS`U�O L , • ; : c L , y J , _ I \ WELL SITE <br />✓ERBURDE 1 �.�1 I� ti p p— p 1 1\ <br />STOCKPIL <br />OVERBURDEN::: I I 1 1 1 <br />,1 r GGREGATE 1 d l PROPOS D 24" <br />I� i PILE STOCKPILE <br />i FILL PIP I w 1 <br />EXISTING ( ;, �! I I > <br />�OTSEEE� ,. EXISTING DISTURBED i� I TOP SOIL I <br />SCALE <br />AREA ��� EXISTING I I STOCKPILE I I <br />DISTURBED HOUSE <br />I / EXISTING AREA I IVl �(Jl I I I I <br />MINING LIMITS <br />�i EXISTING LUPTON �� PLANT <br />BOTTOMS DITCH / IO <br />/ <br />(SEE NOTE 2) I (SEE NOTE 1) <br />MATCH EXCAVATION <br />/ I i EXISTING ACCESS / TO EXISTING PIT FLOOR , \> > , f i r I 10 ER EN <br />\rr / / J <br />/ J i ROAD —!' i l l AGGREGATE I I TOCK I _E <br />, PILE I 1 / <br />" -� SEE NOTE 4) I I / <br />., r.: ......- I <br />EXISTING POND �r rl l r r 1 "r) 1 / <br />I � I <br />I <br />/ <br />GAS <br />L / <br />/ Z <br />T BED F IN <br />� EWATERED LOW G <br />I <br />r <br />r <br />'SLURRY Y WALL CONST UCTION <br />I <br />r � � r F T I <br />r ,, I I / <br />�r'r r , , r <br />/ WETLANDS ,.r ,, ry," r rrrA I I <br />, rrr r <br />/ l / <br />;i r 1,, ))L,! l, r r r I I <br />' IPRESERVATION, � �� - � <br />UPTON BOTTOMS <br />/ ENHANCEMENT, ITCH NO. 1 r 1 '' , 1 6 i <br />/ MENDE[1 x r "> <br />NO MITIGATION OVERBURDEN , �' r r r r r" r' r <br />AREA s5 �rrr PT ,' As )AM' N If�Ci Jrf rr I I f \ l <br />STOCKPILE / _ �. I <br />i (APPROIT. � AIPPROX. LIMITS,' <br />8� 3 TOTAL A�NR E <br />10 <br />Y _ / <br />�— —G— <br />—r,r_. ,r -� �;t A ES) �� I r fr <br />41 <br />L <br />/ SEE NOTE <br />IVERT DITCH - <br />0,0— ONU—_. ONU _ I — — — \ — _ i'� D RING MINING <br />— — — — — — — — — a«r _ — — "- �., ,,.i �S _tE—NOTE 2) <br />oxw__ <br />' au` _ <br />LUPTON BOTT MS ` I <br />DITCH BRANCH <br />r <br />r <br />WETLANDS I I I ! <br />PRESERVATION, 1 1 1 I <br />ENHANCEMENT, AND \ l o l <br />MITIGATION <br />)"30 <br />GRAPHIC SCALE <br />( IN FEET ) <br />1 inch = 200 ft. <br />TYPICAL CROSS SECTION OF PIT EDGE <br />SCALE: 1" =200' <br />RESERVOIR SLURRY <br />WATER SURFACE TOP OF WALL <br />CUT (30 ") <br />(SEE NOTE 6) PERMIT <br />CONCURRENT BOUNDARY <br />BACKFILLING AT <br />3:1 SLOPE <br />BASE OF USING <br />RESERVOIR OVERBURDEN <br />FROM SITE <br />III III III I _.III III III III III 'III <br />II III III III II III III III III Ilf 111 <br />I III III III I III III III- III III :III <br />III IF . , I I I I I I I I I I I I I I I I I I I I I I l l I <br />iii —iii III II Ili lil III III Ilf_III <br />v <br />;� <br />/ \ BACK FI LL GROUND GROUND <br />/ III III I :III II III III I <br />I I I III I III III -III III III- III- <br />`'' <br />/SHALE BEDROCK' <br />SLURRY WALL <br />KEYED INTO <br />SHALE MIN. 3 FT. <br />NOTES: <br />1. PLANT LOCATION MAY BE MOVED AS OPERATIONS PROGRESS. PLANT MAY BE LOCATED IN PIT <br />BOTTOM AREA WHEN DRY MINING OPENS UP SUBSTANTIAL AREAS. <br />2. DURING MINING OF LUPTON BOTTOM DITCH AREA, DITCH WATER WILL BE DIVERTED, VIA A WEIR <br />SYSTEM, TO DEWATERING DITCHES AND /OR SETTLING PONDS FOR CLARIFICATION PRIOR TO DISCHARGE. <br />DIVERSION OF LUPTON BOTTOMS DITCH WILL TAKE PLACE IN STAGES, ALLOWING MINING TO <br />POTENTIALLY PROCEED TO COMPLETION IN EAST CELL PRIOR TO REROUTING THE CHANNEL. ALL <br />ISSUES RELATED TO DITCH OPERATIONS RESOLVED BY AGREEMENT OF THE APPLICANT AND THE DITCH <br />COMPANY. (SEE APPENDIX B) <br />3. TOPOGRAPHICAL CONTOURS TAKEN FROM USGS FORT LUPTON COLORADO QUADRANGLE AT 10' <br />CONTOUR INTERVALS AND INTERPOLATED AT 2' CONTOUR INTERVALS. <br />4. STOCKPILE LOCATIONS AND SIZE WILL VARY DURING THE COURSE OF OPERATIONS. STOCKPILE <br />PLACEMENT WILL BE LIMITED TO DISTURBED AREAS. <br />5. THE LOCATION FOR THE SETTLING POND IS THE NORTHERN EDGE OF SITE. THE SETTLING POND <br />AREA WILL MEET APPLICABLE STANDARDS AND REGULATIONS, TO KEEP SETTLING PONDS ABOVE PIT <br />EDGE AT THE FINAL STAGE OF MINING, SETTLING PONDS MAY BE TEMPORARILY LOCATED TO THE TOP <br />OF AN OVERBURDEN STOCKPILE OR BACKFILL IN AN AREA ALREADY MINED OUT WITHIN THE BASIN <br />AREA. THE PIT FLOOR IMMEDIATELY BELOW THE SETTLING POND AREA WILL SUPPLY WATER FROM THE <br />PIT THROUGH A PUMP OR - PUMPS. <br />6. SLURRY WALL OFFSETS WILL VARY. FINAL SLURRY WALL DESIGN AND DETAILS TO PROVIDED FOR <br />DMG APPROVAL PRIOR TO INSTALLATION. <br />7. SAND AND GRAVEL RECOVERY IN THE SOUTHWEST CORNER OF THE MINED AREA MAY BE REDUCED <br />IN SCOPE. THIS PLAN ILLUSTRATES A MAXIMUM IMPACT SCENARIO FOR PERMITTING AND BONDING <br />PURPOSES. <br />EXHIBIT C -3: MINING PLAN MAP <br />RECEIVED <br />OCT 19 2001 <br />Division of Minerals and Geology <br />101111IIIII IIIII NI IIIII lil I IIIII IIIII IIII IIII <br />0 0 0 1 2 1 6 8 <br />PL <br />PROPERTY LINE \PERMITTED AREA <br />— — — — — — <br />PROPOSED MINING LIMITS <br />SECTION LINE <br />— — <br />EXISTING MINING LIMITS <br />WATERWAY <br />DITCH <br />— OHU— OHU— ON'] — OHU— <br />OVERHEAD UTILITY <br />— cis — <br />UNDERGROUND GAS LINE <br />UNDERGROUND FIBER OPTICS CABLE <br />SLURRY WALL <br />UNPAVED ROAD <br />----- - - - - -- <br />EASEMENT <br />EXISTING INTERMEDIATE CONTOURS <br />�— <br />EXISTING INDEX CONTOURS <br />®OIL /GAS <br />OIL /GAS WELL <br />AMENDED MINE AREA <br />''/ <br />AGGREGATE STOCKPILE <br />TOPSOIL STOCKPILE <br />OVERBURDEN PILE <br />NOTES: <br />1. PLANT LOCATION MAY BE MOVED AS OPERATIONS PROGRESS. PLANT MAY BE LOCATED IN PIT <br />BOTTOM AREA WHEN DRY MINING OPENS UP SUBSTANTIAL AREAS. <br />2. DURING MINING OF LUPTON BOTTOM DITCH AREA, DITCH WATER WILL BE DIVERTED, VIA A WEIR <br />SYSTEM, TO DEWATERING DITCHES AND /OR SETTLING PONDS FOR CLARIFICATION PRIOR TO DISCHARGE. <br />DIVERSION OF LUPTON BOTTOMS DITCH WILL TAKE PLACE IN STAGES, ALLOWING MINING TO <br />POTENTIALLY PROCEED TO COMPLETION IN EAST CELL PRIOR TO REROUTING THE CHANNEL. ALL <br />ISSUES RELATED TO DITCH OPERATIONS RESOLVED BY AGREEMENT OF THE APPLICANT AND THE DITCH <br />COMPANY. (SEE APPENDIX B) <br />3. TOPOGRAPHICAL CONTOURS TAKEN FROM USGS FORT LUPTON COLORADO QUADRANGLE AT 10' <br />CONTOUR INTERVALS AND INTERPOLATED AT 2' CONTOUR INTERVALS. <br />4. STOCKPILE LOCATIONS AND SIZE WILL VARY DURING THE COURSE OF OPERATIONS. STOCKPILE <br />PLACEMENT WILL BE LIMITED TO DISTURBED AREAS. <br />5. THE LOCATION FOR THE SETTLING POND IS THE NORTHERN EDGE OF SITE. THE SETTLING POND <br />AREA WILL MEET APPLICABLE STANDARDS AND REGULATIONS, TO KEEP SETTLING PONDS ABOVE PIT <br />EDGE AT THE FINAL STAGE OF MINING, SETTLING PONDS MAY BE TEMPORARILY LOCATED TO THE TOP <br />OF AN OVERBURDEN STOCKPILE OR BACKFILL IN AN AREA ALREADY MINED OUT WITHIN THE BASIN <br />AREA. THE PIT FLOOR IMMEDIATELY BELOW THE SETTLING POND AREA WILL SUPPLY WATER FROM THE <br />PIT THROUGH A PUMP OR - PUMPS. <br />6. SLURRY WALL OFFSETS WILL VARY. FINAL SLURRY WALL DESIGN AND DETAILS TO PROVIDED FOR <br />DMG APPROVAL PRIOR TO INSTALLATION. <br />7. SAND AND GRAVEL RECOVERY IN THE SOUTHWEST CORNER OF THE MINED AREA MAY BE REDUCED <br />IN SCOPE. THIS PLAN ILLUSTRATES A MAXIMUM IMPACT SCENARIO FOR PERMITTING AND BONDING <br />PURPOSES. <br />EXHIBIT C -3: MINING PLAN MAP <br />RECEIVED <br />OCT 19 2001 <br />Division of Minerals and Geology <br />101111IIIII IIIII NI IIIII lil I IIIII IIIII IIII IIII <br />0 0 0 1 2 1 6 8 <br />