Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 003 <br />Date : 06/07/2006 <br />User : KAP <br />State :Colorado PermiUjob# : M-1999-117 <br />County : Saguache Abbreviation : none <br />Site :Colorado Gravel Products Filename :M117-003 <br />Agency or organization name :Colorado Division O(Minerals And Geology <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description :Grade PrOCeSSlI1q and BHtCh AredS <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br />Source of estimated volume :8 ac x 6 in. de <br />Source of estimated swell factor :Cat Handboo <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Compacted (ill or embankment <br />Average push gradient : 0.00 % (r <br />Average site altitude : 7,690 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />ep <br />(Earth -Dry Pack) <br />Job Condition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 _ <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.40 <br /> <br />Adjusted unit production : k <br />198.57 <br />Adjusted fleet production : 198.57 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shiWday) <br />(Cat HB) <br />(Caf HB) <br />(Cat HB) <br />(S/SU/U) <br />LCY7hr <br />LCY(hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 19.94 Hours <br />Unit cost : $0.815 /LCY Total job cost : $3,226 <br />