Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />010 State :Colorado Permitfjob # : M-1999-117 <br />06/07/2006 <br />KAP <br />County:Saguache <br />Site :Colorado Gravef Products <br />Permit or otherjob action :Bond Recalculation Related To Inspection <br />Task description :Haul Topsoil to Pit Floor <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 623G <br />-Push dozer:~NA _ <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Cost Bre <br />Road maintenance-Motorgrader:NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cost/hour : $51.76 NA NA NA NA NA <br />OperatingcosUhour: $94.45 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $171.16 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $171.16 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $171.16 <br />MATERIAL QUANTITIES <br />Initial Swell Loose ' <br />volume : 7,630 CCY <br />factor : 1.125 volume : 8,584 LCY <br />Abbreviation :none <br />Filename : M117-010 <br />' Source of quantity take-off :Reclamation Plan <br />Source of estimated swell factor :Cat Handbook (Earth <br />