Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name <br />Colorado Division Of Minerals And Geology <br />008 State :Colorado <br />06/07/2006 County:Saguache <br />KAP Site :Colorado Gravel Products <br />PermiUjob # :M-1999-117 <br />Abbreviation :none <br />Filename : M117-008 <br />Permit or otherjob action :Bond Recalculation Related To Inspection <br />Task description :Remove Gravel Veneer from Roadway <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 623G <br />-Push dozer :NA <br />Support equipment-Load area :NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-W ater truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $51.76 ~NA NA NA NA NA <br />Operating cost/hour : $94.45 NA NA NA NA NA <br />Ripper op. costthour : NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $171.16 'NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $171.16 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $171.16 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 642 CCY factor: 1.215 volume: 780 LCY <br />Source of quantity take-off :Reclamation Plan <br />Source of estimated swell factor :Cat Handbook (Rock Earth 75 <br />