RECLAMATION PLAN <br />The post-mining plan allows the pit to flood and the border of the lake to be reclaimed as <br />wetland. Also the land surrounding the permit area will be topsoiled and seeded to control <br />erosion. Prior to flooding all earthwork and seeding will take place. Mining slopes will be near <br />vertical. The slopes will be reclaimed to 3H:1 V by dozing the upper highwall down towards the <br />pit bottom. The remainder of the cut/fill balance will be made up from excess overbwden and <br />imported materials. The imported materials will be inert. They will be imported from the <br />adjacent production facility. A majority ofthe imported materials will be reclaimed asphalt and <br />concrete. All concrete with exposed rebaz will be buried a minimum of 3' from the surface. <br />Imported material greater the 2" in diameter will only be used in slope reclamation not in the <br />replacement of the buffer between Amendment #1 and Amendment #2. To further enhance <br />wetland growth, the ramp used to get in and out of the pit will be left at 7H:1 V for a width of <br />approximately 24 feet. <br />Fow major tasks will occur at the end of mining: Final Grading, Buffer Replacement, <br />Topsoiling, and Seeding/Revegetation. The site is expected to have 1500 feet of highwall left at <br />the end of mining. The cross-sectional area to be moved is 300 square feet. This results in <br />17,000 CYD to be moved. The material will be moved using a D8 or equivalent dozer. Once <br />final grading has been completed the 1500 feet of highwall will need to be topsoiled. The buffer <br />will be installed as seen in Map F. The buffer will have a 50' wide bench on top with 3H:1 V side <br />slopes. It will be replaced using 2" minus material only. This will help to enswe the 90% <br />maximum dry density compaction of all buffer material. The compaction will be completed in <br />small 12" lifts. Also all compaction will be measwed to enswe that the specification of 90% is <br />met. Once the buffer installation and highwall grading ~s complete, both slopes and flat areas <br />will be topsoiled with a minimum of 6" of material to a elevation 5' below the expected water <br />table. Once all earthwork has been completed the entire Amendments #1, #2, and #3 will be <br />revegetated as wetland or dry rangeland. The total area remaining is 15.58 acres. 1.25 acres will <br />be revegetated as wetland fringe, and 14.33 will be revegetated as dry rangeland. <br />For both the dryland and wetland areas, the soil will be disced to loosen the soil. Due to the <br />mild grade, seed can be drilled in both regions. Certified weed free mulch will be crimped into <br />the surface at 20001bs per acre for the dry rangeland areas. The areas will be seeded with the <br />following seed mixes, which were recommended by the NRCS for the nearby Fredlund Pit, west <br />of the site. <br />JAN 1 22004 <br />~a . r~3a ; <br />t+ tef °s6a~,~evmut 3 ,~,~ <br />Pit No. 1 1/04 <br />