My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28921
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:04 PM
Creation date
11/21/2007 12:06:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
9/29/1993
From
RCG HAGLER BAILLY INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_~ <br /> <br /> <br />Regarding other matters discussed in your letter, I have sent via fax at least o different <br />times copies of the June 1 -June 30 detailed summary of expenses to th Division. I <br />have enclosed another copy with this letter. Please let me know if yo need more <br />information for this or any other period of time. <br />I do apologize for the delay in the past sampling trip. I have traveled moron business <br />this summer than any other time in my life and just could not physically d the trip. I <br />did the third and fourth monitoring trips relatively close together because knew I had <br />an inordinate amount of travel coming up. I was able to set up a samplin trip for two <br />days after the end of the last period, but apparently this was unacceptable t BMRI. In <br />light of the long delay in receiving sampling results from Core Labs in the ast, I really <br />didn't think this was a significant delay, but I was obviously mistaken. I do ope that we <br />can finish up the last of the monitoring trips to everyone's satisfaction, and have called <br />Alana Scott to set up a trip for the week of October 11. <br />As we discussed briefly at Snowmass, I do feel it would be a good idea to have a final <br />summary report that looked at possible trends in the data and made some final <br />conclusions and recommendations in a form that would be easily accessible o the public <br />and the Board. I was unclear from your letter whether you would like m to write to <br />BMRI and suggest that I write a final report. I assume that you w uld be the <br />intermediary on that, but let me know if I should write them directly. <br />Please let me know if you need more information than what I have suppli d above. I <br />look forward to the successful completion of this project -- it has bee a learning <br />experience for all. I just hope that the difficulties encountered in this firs third-party <br />monitoring experience wiii serve to make future sitniiar projects run more moothiy. <br />Sincerely, <br />a~~,~- <br />Ann Maest, Ph.D. <br />Senior Scientist <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.