My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28885
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:03 PM
Creation date
11/21/2007 12:05:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
4/10/1998
Doc Name
NOV
Violation No.
CV1998005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ <br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV-98-005 <br />NATURE OF VIOLATION: <br />Failure to construct and maintain the light use road providing access to the South Fan Installation to <br />control or prevent erosion and siltation. Failure to ensure that the ligh use road providing access to the <br />South Fan Installation will not cause additional contributions of suspended solids to runoff outside the <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) Sections 34-33-120(2)(j) and 34-33-121(2)~jl <br />REGULATION <br />SECTION(S) Sections 4.03.3(11(a) and (bl <br />PERMIT <br />SECTION(S) Section 2.05 3. gage 2.05.3-41a <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />The South Fan Installation light use road from the south end of the GEC Mine East Pit to the fan. the <br />entire permitted le~th <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />1. Develop a plan for stabilization of road ditches and road surface- and submit a complete applietion <br />for a technical revision to incorporate the plan into the approved ermit application package <br />~, Obtain Division approval for the revision <br />~ Implement the approved ditch stabilization plan <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): ON OR BEFORE Julv 9. 1998. <br />Step 1: On or before April 22. 1998 <br />Step 2: On or before June 29. 1998 <br />Step 3: On or before July 9. 1998 <br />0221E (3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.