My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28845
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:01 PM
Creation date
11/21/2007 12:04:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Enforcement
Doc Date
12/12/1990
Doc Name
PROPOSED SETTLEMENT AGREEMENT FOR NOV C-90-046 ENERGY MINE 3
From
MLRD
To
COLORADO YAMPA COAL CO
Violation No.
CV1990046
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1373 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />FA K: 303 632-8106 <br />SETTLEMENT AGREEMENT <br />Cessation Order No. N/A <br />OF.Cp~ <br />r.~~~ ~y <br />ye;;' ~g <br />a O '. <br />~ 18"!6 ~ <br />Notice of Violation No <br />Ray Romer. <br />Governor <br />Fretl R. Banta. <br />Dnrision Director <br />C-90-046 <br />Mine Name: tAine No. 3 Permit No.: C-84-062 <br />Permittee: Colorado Yampa Coal Co. <br />Mailing Address: 29587 Routt County Road No. 27, Oak Creek, CO 80467 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Routt Type of Mine: Private/Surface <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on December 4, 1990, the Division and the <br />operator hereby agree as follows: <br />1. The amount of the penalty shall be 3750.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within <br />ten days after the closing date of such conference. The ten day period shall <br />commence upon receipt of the settlement agreement by the operator. If not so <br />signed, the Division will fix the penalty at whatever amount it deems <br />appropriate, based upon the factors referred to in C.R.S. 1973, <br />34-33-123(8)(d). <br />DATE: <br />OPER <br />By <br />DATE: ~~%~~J~; <br />C.R.S. 34-33-123(8)(c)(d) <br />DIVISI/~ON~ OF MINED~L.,AOND RECLAMATION <br />~Terence~~ cer <br />1970E <br />
The URL can be used to link to this page
Your browser does not support the video tag.