Laserfiche WebLink
<br />COOLEY RESERVOIR A1ND FULTON WILDLIFE AREA PIT <br />AMENDMENT NO. 1 - JERONIMUS PROPERTY <br />Other aspects or standards involved in the reclamation plan are as follows: <br />No acid or other toxic forming materials are known to exist in the topsoil, <br />overburden, or aggregate material to be mined at the site. Refuse generated will be <br />collected in the appropriate containers and hauled to a solid waste transfer station or <br />landfill facility, and no waste or refuse will be disposed of on site. <br />2, At AI's discretion, one private boat ramp may be constructed for ease of boat access <br />to any remaining lake area. <br />3. Per the Noxious Weed Control Plan in EXI~IT D - MIMNG PLAN, noxious <br />weeds wiIl be controlled, particularly Diffuse Knapweed, Scotch Thistle, and Canada <br />Thistle, which have been observed within the permit area and on adjacent property. <br />All areas adjacent to roadways and waterways will be assessed every spring to <br />determine the best management practice for weed control. At a minimum, all noxious <br />weed areas will 6e mowed as needed. In heavily invested areas, approved herbicides <br />will be applied as needed to include, but not limited to, Tordon 22K applied at 1 pt/ac <br />at 20 gpa or 2,4-D 4;r amine at 1 gt/ac at 20 gpa. Consultation with qualified <br />vegetation managers and/or county weed control coordinators will be on-going to <br />assist in the management of noxious weeds. <br /> <br />