Laserfiche WebLink
<br />CIRDES Cast Estimatlno Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Agency or organization name : OMG <br />Task#: 006 State: CO/credo PermiVjob N: M-1996-089 <br />Dale: 022N21N12 County: $apuacha gbbraratlon: none <br />User: RCO Site: Skoglund Pi[ Filename: M089-006 <br />Permit or other job action :Bond <br />Task description :Haul <br />EQUIPMENT TRANSPORT RIG COST Shitt basis 1 per day <br />Cost tlata source: CRG Dafa <br />Truck tractor description :Generic on-highway truck haclo; 6x4, diesel powered, 400 HP <br />Trvck trailer description :Generic /oldin0 9wseneck, drop deck equipment bailer 25r SOT and 9077 <br />Available rig wpacNes: 0-25 TOna 26-50 Tons 51•TOna <br />Cost Breakdown : Ownership cost/hour $24.23 $28.32 $3084 <br />Operating cosUhquc $30.25 $32. D5 $3462 <br />Operator cosUhour: 526.59 $26.54 $2654 <br />Helper cosVhour: $22.]0 $22]0 $22]0 <br />Total Unit COSUhour: <br />~.e.4 <br />- <br />- 5103.]1 $110.50 $114.68 <br />~ .~«-.+ <br />- .. ._~ <br />NON420ADABLE EOU PM ENT <br />Machine <br />Description WeighVUnit <br />(Tons) Ownership <br />CosVhr/unit Haul Rig <br />CosVhr/unit Fleet Siza <br />(NO. units) Haul Trip <br />CosUhrttlee[ Return Trip <br />GosVhrMleM DOT permit <br />CosVtlae[ <br />-Cat D8R-85U 52.22 $4850 $114.69 f 8164.20 $114.69 80.00 <br />-Reveg equip( 1st 8.00 $1000 $103.]1 1 E113.]1 S103J1 E0.00 <br />-Reveg equips 2nd 8.00 $1000 $103.]1 1 $113.]1 5103.]1 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5391.62 5322.11 E0.00 <br />RDADABLE EQUIPMENT <br />Machine Total Fleet Size Haul Trip Re[um Trip <br />Descdption Cost/hour/unit (N0. unitsl CosVhrHleet CosVhr/fleet <br />['_ ,..r.-~ w _ - . -_ <br />EQUIPMENT HAUL DISTANCE antl TIME ~ __._ ~~ <br />Nearest major city or town within project area region: Alamosa, Co <br />Transportation CVde Tme: Non- Total one-way travel tlrstance: 50.0 miles <br />Roadable Roadable Average Vavel speed: 50.0 mph <br />Haul time (hours)= 100 1.00 Total non-roadable mobltlemob cost': $$2fOJ0 <br />RCNm tame (hours)= 1.00 100 'lwo routs Nys WIh WNdg <br />Loading time (hours) = 050 NA Total roadable mob/demob cos["' 80.00 <br />Unloatling time (hours)= 0.50 NA -one ramd rap. no haw nn <br />Subtotals= 3.00 2.00 <br /> <br />JOB TIME AND COST Total lob tlme 6.00 hours <br />Total job cost: $2,211 <br />