Laserfiche WebLink
Permit for the entire site within 180 days of the date this Order is mailed to the Operator. The <br />Board hereby orders the Operator to pay civil penalties in the amount of $51,416.00 based on <br />$1,000.00 per day calculated from the date of the Division inspection, September 28, 2004, <br />through the date of the originally scheduled Board hearing, November 16, 2004, a total of 50 <br />days, plus costs incurred by the Division staff in investigating this matter, or $1,416.00. The <br />sum of $1,416.00 shall be due and payable to the Division within 30 days of the mailing of a <br />signed Board Order. All but $10,000.00 of the remaining $50,000.00 in civil penalties shall <br />be suspended if the Operator undertakes the prescribed corrective actions in a timely manner, <br />as described herein. <br />DATED this ~ day of J,~,vv ~-' 7 , 2005. <br />FOR THE COLORADO MINED LAND RECLAMATION BOARD <br />L <br />an Ellison, Acting Chair, Mined Land <br />Reclamation Boazd <br />