Laserfiche WebLink
FAULT <br />The operator waz negligent in not submitting the Annual Reclamation Report by the due date in <br />the regulations. The operator apparently did not believe they were required to monitor <br />revegetation on the wazte pile until a later date, hazed upon language in the mine permit. $250 <br />is assessed for a low level of negligence. <br />GOOD FAITH <br />The NOV has not yet been abated. Therefore, good faith is not relevant at this time. <br />