Laserfiche WebLink
RECEIVED • IIIIIII6IIIIIIIi <br /> APR 1 o 2or��o�4vSTATE OF COLORADO <br /> DIVISION OF MINERALS AND CEOnIY*A0IMkW*&GEOIO�lr BFi MOICE STAMP <br /> Decarment ur `.amral Resources <br /> In <br /> 1 31 3 Sne•man St.. Room i 3 Van x'Sa0G9 StlArrrd !d0 • W Mitlels m� <br /> Ceove•. Colorado Z0_03 <br /> Phcne 3C3;36o-350, <br /> F.::,. 3(:31 33]-3:J6 TRANSFER OF MINERA-[. RECL_A-NL-kTIONpUC.No bVQ26,1-7? 2 Sunlit 00/ <br /> Dept OCA Object Program <br /> SUCCESSION OF OPERATORS lSboO r 3 t 00 <br /> APPLICATION PACKAGE Project SubProlect Penal AMP/RMP <br /> (flow Code 1) (tiear Code <br /> Applicability Appr Sign Ddt Appr Sipe Data <br /> This doeiment applies to mining operations where the current pe,mirted mine operator wig es to transfer the Reclamation <br /> Permit and permitted reclamation responsibilities to a Successor Operator(a new operator). Please fo,low the instructions <br /> provided in this package for filing an application; Mineral Rules and Regulations and Construction Material Rules and <br /> Regulations dumber 1.12 (Permit Transfer application requirements) should also be reviewed pricr to completing this <br /> form. <br /> Filing Requirements <br /> To apply for a transfer please submit the following to the Division of Minerals and Geology(the"Division'): <br /> 1) A "Transfer of Permit and Succession of Operator" application form, signed and notarized by an authorized <br /> representative of BOTH the current permittee and successor operator; <br /> 3) The Application Fee of 3100.00; <br /> :) A Performance Warranty Form bearing an original notarized signature of an authorized representative of the <br /> successor operator; and. <br /> 4) Financial Warranty. <br /> A) I ou have the option to WAM YO"-7m RIGHT to a thin (30) day processing time to allow the <br /> Division time to recalculate the required financial warranty; or, <br /> B) You may choose NOT TO WAIVE YOUR RIGHT to a thirty(30)day processing nme. In such case. <br /> the Division will recalculate the required financial warranty within sixty(60)days from the decision <br /> date (the-date the permit is transferred to the Successor Operator). The required RFCLANLATION <br /> BOND COULD BE SUBSTANTIALLY INCREASED at that time. If the fincial warranty_ is <br /> increased,you will then be required to post the additional financial warranty. <br /> This application package contains the "Transfer of Permit and Succession of Operator" application form. and a <br /> Performance Warranty Form for your use. Rule 4.3 of the Nlineral Rules and Regulations and Rule 4.3 of the Construction <br /> Material Rules and Regulations describes the various acceptable Financial Warranty apes. Please contact the Division <br /> to obtain the appropriate Financial Warranty form. <br /> Upon submittal of this application, the application fee, and the replacement performance and financial warranties the <br /> Division will transfer the permit to the Successor Operator. After the transfer is complete the Division will then review <br /> the reclamation costs of the permitted operation. The Successor Operator will be notified, if additional reclamation bond <br /> is required,within 60 days of approval if you do not wave vow right to a decision within 30 days. The Division will notify <br /> both operators upon completion of the pennit transfer. <br />