Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV-2007-003 <br />NATURE OF VIOLATION: <br />Failure to conduct mine operations in accordance with the permitted operations plan; specifically, the <br />un-permitted disturbance of the ground surface and the drilling of holes and digging of test pits as part of <br />a geotechnical investigation for a proposed surface mine water reservoir, and without prior approval and <br />within the performance bond in effect. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 34-33-110(2)(j) <br />REGULATION <br />SECTION(S) 2.01.3(1), 2.05.3(2)(b), 2.07.7(6), 2.07.7(7), 2.08.4(2), 3.02.1(2) and 3.02.1(3). <br />PERMIT <br />SECTION(S) Permit: Section 2.05 of the Permit Application Package (PAP). <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />This notice applies to the un-permitted surface disturbance from drilling of holes and digging of test pits <br />(geotechnical investigations) associated with a proposed reservoir in the SEl/4 Sec 17 TSN R86W. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Step 1: Submit a revision to the PAP to permit the geotechnical investigations that includes a description of <br />exploration activities, an evaluation of impacts from the activities, reclamation of disturbances (backfilling <br />of pits, sealing of drill holes, and reseeding), and cost of reclamation. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE: <br />Step 1:20 September 2007. <br />NOV FORM (3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />