My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28614
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:51 PM
Creation date
11/21/2007 12:00:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Enforcement
Doc Date
7/27/2004
Doc Name
Continuation of Enforcement Hearing
From
DMG
To
Varra Companies Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 ~ ~ L ~ ~ D ~ <br />Denver, Colorado 80203 DIVISION O F <br />Phone: (303) 866-3567 MIN & A I- S <br />FAX: (303) 832-8106 G E ~ L ~ G Y <br /> 0.ECLANATION~NINING <br /> SAFETY•SLIENCF <br />Ju]y 27, 2004 - <br /> Bill Owens <br /> Governor <br />Christopher L. Yana <br /> <br />Varna CCRlpanles, Ine. Russell George <br /> <br />8120 Gage Sheet Executive DlreCtOr <br />Frederick, CO 80516 Ronald w. Cottony <br /> Division Director <br />RE: Continuation of Enforcement Hearing • Durham Pit, Permit No. M-75-056 Natural Resource Trustee <br />May 27, 2004 Reasou To Believe A Violation Exist Letter, Class: Enforcement <br />Deaz Mr. Varna: <br />The Division has postponed the scheduled hearing for the Durham Pit as referenced in the Division's May 27, 2004 Reason To Believe A <br />Violation Exist Letter. The hearing scheduled for the July 28-29, 2004 Hoard Meeting has been re-scheduled for the November 17-] 8, <br />2004 Boazd Meeting. As discussed between Varna Companies, Inc. and the Division on July 14, 2004, the Division may withdraw the <br />pending enforcement hearing depending on the outcome of the Amendment No. 2 hearing scheduled for Board consideration at the <br />October 27-28, 2004 Boazd Meeting. We look forward to resolving all concerns associated with the current configuration of the existing <br />flood control dike, to the extent possible, on or before October 27-28, 2004. 1n particular, we look forward [o Anderson Consulting <br />Engineers (ACE) hydraulic evaluation as referenced in your July 16, 2004 request far continuance of the scheduled hearing. <br />Please call me a[ (303) 866-3567 if you have any questions regarding this matter. <br />Sincerely, <br />Thomas A. Schreiner <br />Envuonmenta] Protection Specialist <br />Ca Carl Mount, DMG (via E-Mail) <br />Mr. Bradford Janes <br />Varna Companies, Inc. <br />1431 East 16'" Street <br />Greeley, CO 80631 <br />Office of -~ Office of Colorado <br />Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.