Laserfiche WebLink
RECLAMATION TIMETABLE <br />Estimated Acres +/- <br />Phase Years Slope Floor Revegetation <br />Total <br />1 3 sre xoc~ t 18.42 4.38 22.80 22.80 <br />2 55-60 30.32 16.98 47.30 47.30 <br />3 3 s~ xok ~ 1.81 8.37 10.18 10.18 <br />4 45-50 6.25 9.27 15.52 15.52 <br />5 3 45-50 13.02 8.97 21.99 21.99 <br />6 3 20-25 6.13 2.00 8.13 8.13 <br />7 45-50 4.90 0.69 5.59 5.59 <br />TOTALS 80.85 50.66 131.51 131.51 <br />Note 1: Reclamation is completed in these stages. <br />Some reclamation periods will overlap and be in progress at the same time as others- <br />,allowing for initially mining and reclaiming <br />one-half ofthe phase and then subsequently mining and reclaiming the remaining portion <br />of the phase. <br />24 Revised: Dec. 2003 <br />