My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28483
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:46 PM
Creation date
11/21/2007 11:57:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
5/26/1993
Doc Name
GOLDEN EAGLE MINE PN C-81-013 NEW ELK MINE PN C-81-012
From
BASIN RESOURCES INC
To
MLR
Violation No.
CV1993015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ IIIIIIIIIIIIIIII <br />999 <br />~?r~-^rrr-~' <br />~~ <br />BASIN <br />RESOURCES, ~N~. <br />a subsidiary of ENTECH, Inc <br />May 25, 1993 <br />14300 Highway 12 <br />Weston, Colorado 81091 <br />(719)868-2761 <br />FAX (719) 868-2275 <br />Mr. Joseph Dudash <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 :j:-: -. -,., ,_ <br />Re: Golden Eagle Mine Permit No. C-81-0~3~'~fi jq9~ <br />New Elk Mine Permit No. C-81-012 <br />Dear Mr. Dudash: ~,.,..... 1 r'o"`yVC~~Vy'Y <br />Extension of Time of Abatement <br />Basin Resources requests an extension for the following <br />violations: <br />NOV C-93-43 East Mine Underground Development Waste Pile: <br />The pile has been slope as per our discussions during the <br />inspection. Lincoln Devore will be doing a follow-up <br />compaction test the first week of June. This test will then <br />be incorporated into the Quarterly certification. They <br />normal take a week to ten days to complete their report. <br />Thus I am requesting an extension to June 15th, 1993. <br />C-93-39 Oil Spillage - DOT barrels were received Monday, <br />May 24. Clean up was started on Monday Work is projected <br />to be completed by Friday afternoon May 28. Therefore an <br />extension is requested to May 28, 1993. <br />C-93-37 The Road east of the RDA has been closed off. <br />Temporary erosion control measures will be installed as <br />necessary to control erosion. A Technical Revision will be <br />Submitted by June 15th to permit a road to the conveyor, or <br />permanent reclamation measures will be taken. <br />GE & NE Culverts - Culverts have been ordered to replace <br />missing and under sized culverts. Golden Eagle Culvert C-3 <br />has been replaced with a 24" culvert from stock. A TR has <br />been submitted to remove culvert C-15 at the New Elk Mine. <br />Likewise a TR has been submitted along with documentation, <br />changing culvert C-6 from 60" to a 54" culvert with 9.72" of <br />headwater over the culvert. <br />
The URL can be used to link to this page
Your browser does not support the video tag.