Laserfiche WebLink
FROM FLQT [PON COMPANIES 08. 16. 1996 1 3: 46 P. 2 <br /> • O • <br /> FLATIRON' <br /> corvuvre <br /> POST OFFICE BOX 229 BOULDER.COLORADO 80306 • TELEPHONE (303)499.1441 FAX(303)499-2122 <br /> ED MaDOWELL <br /> August 16, 1996 Q�(,EIVED <br /> AUG It less <br /> Division of Minerals& Geology <br /> Mr. Dallas Glasser <br /> WMI Boulder <br /> 4800 Table Mesa Drive <br /> Boulder, CO 80303 <br /> Dear Whitey: <br /> Enclosed is a letter that I sent to you in May of 1991. That <br /> letter asked you to create a berm of topsoil overburden west of <br /> your west mining boundary on our property. <br /> We have planned to use this material for the development of the <br /> land you are now completing the mining and reclamation on under <br /> Permit M 81-302, as well as on lands we own to the west and north. <br /> It now appears likely that this topsoil overburden will be needed <br /> to complete the reclamation of M 81-302. You have our permission <br /> to use as much of this material as is needed to complete that <br /> reclamation project. should a portion of the material not be <br /> needed for the reclamation, please reshape that material into a low <br /> berm on a portion of the area where the current berm sits. <br /> Very truly yours, <br /> CONCRETE EQUIPMENT i SUPPLY CO. <br /> Ed McDowell <br /> President <br />