My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-14_REVISION - M1996052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996052
>
2004-12-14_REVISION - M1996052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:45 PM
Creation date
11/21/2007 11:56:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
Revision
Doc Date
12/14/2004
Doc Name
Bond Calculation
From
DMG
To
File
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 12/14/2004 <br />User : KAP <br />State :Colorado PermiUjob# : M-1996-052 <br />County :Weld Abbreviation :none <br />Site :Del Camino Sand And Gravel Filename :M052-005 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : SO <br />Task description :Grade Topsoil <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series 11- 8SU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br /> Operating cosVhour : $69.39 100 <br /> Ripper op. cosVhour : $1.57 20 <br /> Operator cost/hour : $31.76 NA <br /> Total unit cosUhour : $151.54 Total fleet cosUhour : $303.08 <br />MATERIAL QUANTITIES ~ ~~ <br />Initial Swell Loose <br />volume: 16,133 LCY factor : NA volume: 16,133 LCY <br /> <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB} <br />Unadjusted hourly production : 377.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (fid-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 177.49 LCY/hr <br /> Adjusted fleet production : 354.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 45.45 Hours <br />Unit cost : $0.854 /LCY Total job cost : $13, 774 <br />
The URL can be used to link to this page
Your browser does not support the video tag.