Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 1 2/1 42 0 04 <br />User : 1CAp <br />State :Colorado <br />County :Weld <br />Site :Del Camino Sand And Gravef <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action : SO <br />Task description :Grade Highwalls <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : 3-shank doper <br />Horsepower: 310 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $69.39 100 <br />Ripper op. cost hour : $2.35 30 <br />Operator cost/hour : $31.76 NA <br />Total unit cost/hour : $152.33 Total fleet cost/hour : $304.85 <br />MATERIAL QUANTITIES ~ ~ ~ ~ ~ -- ~~~ <br />Initial Swell Loose <br />volume: 242,580 LCY factor: NA volume: 242,580 LCY <br />Source of estimated volume :Reclamation Plan and Map <br />Source of estimated swell factor : NA <br />;. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 377.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />30.00 % Q <br />4, 700 feet <br />2,550 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/dat <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.60 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.72 <br /> <br />Adjusted unit production : 271.64 LCY/hr <br />Adjusted Fleet production : 543.28 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 446.51 Hours <br />Unit cost : $0.561 /LCY Total job cost : $136,030 <br />Permitfjob# : M-1996-052 <br />Abbreviation :none <br />Filename : M052-003 <br />