Laserfiche WebLink
Permit or other lob action $o <br />Task desuiplion : MObIIizPJDemObilize <br />EQUIPMENT TRANSPORT RIG COST~~~ Bhitl basis filer tlay <br />Cost tlata source: CRG Dafa <br />Truck tractor tlescription : Generic on-hghway !ruck lraaor, 6xd, diesel powe2Q 400 HP <br />Truck trailer tlescription :Generic /dtlinAAOOSeneck, drop deck equipment frailer (257, SOT, arM 1007) <br />Cosl Breaktlown '. <br />Available rig ca acilies: 0-25 TOns 26-50 Tons 51+TOns <br />Ownership cost/hour $2332 825.78 $31.45 <br />Operating wsdhour: $3029 $31.74 $3514 <br />Operator WSt/hour: $2]40 $2].40 $27.40 <br />Helper wsMOUr: $000 $2515 $25.15 <br />Total Unif OOSVllnur: $8f 01 Al 1007 I 4f 191i <br />Haul time (hours)= 028 0.28 Total non-readable mobltlamob wst': $3,184.06 <br />Return time (Hours) = 0.28 0.28 ~ ev mum mils vnm Haul m <br />Loading tinre (hours) = 1.00 NA total mailable moD/demob cost °: 8190 f f <br />Unloading time (hours) = 1.00 _ NA_ one mum mil, nil Hem ~g <br />JOB TIME AND COST Total job time: 5.10 hours <br />Total lob cost : <br />Nearest major city or town within project area region : Longmont <br />TfansOprtal On CVde T'me' Non- Total one-way travel tlistanca: 11.0 miles <br />Roatlable Roadable Average travel speetl: 40.0 mph <br />