My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28411
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:43 PM
Creation date
11/21/2007 11:56:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Enforcement
Doc Date
9/7/1990
Doc Name
BLUE FLAME MINE PN C-81-053 ENFORCEMENT HISTORY
From
MLRD
To
DAN MATHEWS
Violation No.
CV0000000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />4. NOV C-89-009 was issued April 4, 1989 for failure to pass all disturbed <br />arainage ru a sedimentation pond and failure to employ sediment control <br />measures specified in the approved plan. Specifically, a small ditch was <br />constructed to convey disturbed (area) runoff from the lower bench, <br />bypassing the sediment pond; non-erosive channels to convey disturbed <br />runoff to the sediment pond were not constructed; and a berm to prevent <br />sloughage of coal over the upper bench outslope had not been constructed. <br />Rule 4.05.2(1), 4.05,5(1)(c), 4.05.5(2)(e) and (f), Map #1, MR #1, and <br />Permit Section 2.04.7 were cited in support of the violation. <br />5 <br />6 <br />Abatement consisted of eliminating the non-approved ditch on the lower <br />bench and constructing the necessary berm or removing the coal stockpile <br />by April l7, 1989. Additional abatement was to submit a complete <br />technical revision application addressing a revised plan for safely <br />conveying disturbed runoff trom the upper and lower benches to the <br />sediment pond by July 3, 1989. The NOV was terminated July 3, 1989. <br />The penalty proposed for the violation was 1650.00, <br />An assessment conference was held June 19, 1989. The violation was <br />upheld and the proposed penalty was not reduced. <br />The proposed penalty was paid August 31, 1989. <br />CO C-89-O11 was issued April 18, 1989 <br />w is requires that either a berm be <br />upper bench or the coal be removed. <br />for failure to abate NOV C-89-009 <br />placed around the coal stored on the <br />Abatement was to either construct a berm around the coal stored on the <br />upper bench or remove coal. (The coal was apparently removed by the end <br />of the day since the violation was terminated April 18, 1989. The coal <br />was, however, conveyed to the Durango landfill for disposal which <br />resulted in the issuance of NOV C-89-012.) <br />The proposed penalty for this violation was 1750.00. <br />An assessment conference was held June 19, 1989. The violation was <br />upheld and the required minimum penalty of 1750.00/day was assessed for <br />one day. <br />The penalty was paid August 31, 1989. <br />NOV C-89-012 was issued April 18, 1989 for failure to dispose of <br />unaergrouno development waste within the permit area. Specifically, <br />waste was being trucked to a landfill. <br />Rule 4.09.1 was cited as being violated. <br />Abatement was to cease hauling and disposal immediately. (Apparently the <br />operator did this). The violation was terminated April 18, 1989. <br />The proposed penalty for this violation was 5900.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.