My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-24_REVISION - M1978268 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978268
>
2003-03-24_REVISION - M1978268 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:23 PM
Creation date
11/21/2007 11:55:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978268
IBM Index Class Name
Revision
Doc Date
3/24/2003
Doc Name
Amendment Application
From
Ouray County
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COSTS ExHiair L <br />FEBRUARY, 2003 Rules 8 Regs 6.4.12 <br />OURAY COUNTY ROADBBRlOGE DEPT aDALLAS GRAVEL* P[IUnT N°O-M 7976-268 <br />P. O. Box 488, Ridgway, CO 87472-0468 S[c 3, T48N, RBW, NMPM, OuMY COUNTII, CO <br />PHONE: 970 828- 6391 AYlNDYlRT APPLIC4TION - R!O 112 OP[R GONST MAT'L <br />D~(/T C~~T.S <br />Note: All slopebanks are to be excavated at the design 2:1 slope template (except pond, which is 3:1). BLM specifies <br />leaving all surfaces rough graded for improved water reterdion and wildlife habitat Thus, smooth-grading is not included <br />in reclamation project costs. Costs are lumped together as a whole, even though staged progressive reclamation shall be <br />practiced. <br />JOB LOCATION JOB DESCRIPTION EQUIP. & HAUL JOB QUANTITY <br /> DIST. /UNIT COST R PRICE <br />O <br /> EARTHWORK -Distribute Topsoil: Cat 938 FronHoader@ $ 19,332 <br />Pond Slopes 1.3 ac $0.634/LCY <br />Stage i Slopes 3.4 ac <br />Stage 2 Slopes 3.8 ac <br />Stage 3 Slopes 2.5 ac <br />Stage 4 SI & Floor 14.2 ac <br /> 25.2 ac x 43,560 ft2/ac x <br /> 0.75 ft = 27 ft3 CY = 30 92 LCY <br />® <br /> <br />EARTHWORK -Smooth Topsoil: _ <br />Cat D-6R-6SU <br />$ 6,261 <br />Pond Slopes 1.3 ac Tracked Bull-dozer <br />Stage 1 Slopes 3.4 ac w/Triple-Ripper ~ <br />Stage 2 Slopes 3.8 ac $0.308/LCY <br />Stage 3 Slopes 2.5 ac <br />Stage 4 SI & Floor 14.2 ac <br /> 25.2 ac x 43,560 ftz/ac x <br /> 0.50 ft _ 27 ft3/ = 20 328 LCY <br />_®_ _ _ _ <br />Slopebanks, Floor, RE-VEGETATION SEEDING - Grass Drill, Tractor, $ 16,912 <br />Pond slopes Fertilize, Seed, & Mulch Strawblowep Crimper <br /> 25.2 ac @ 671.10 ac 25.2 ac <br /> <br />Slopebanks, Floor REFORESTATION Nand plant & Cage $ 13,399 <br />50 ft center to center = 2,500 ft' ea saplings ~ <br />23.9 ac x 43 560 ft2/ac _ 2500 = $32.21/tree 416 trees <br />Total Direct Cost: $ 55,904 <br />INDIRECT COSTS <br />12.6 Mo of Direct Costs (1.55% Liability Its., 1.05 % Perf. Bond, 10% Profit) $ 7, 044 <br />RECLAMATION PROJECT CONTRACT (Direct & Indirect Cost subtotal) $ 62, 948 <br />D.M.G. ADMINISTRATIVE COST <br />C~ 5.00% of Contract Price <br />$3,147 <br />TOTAL RECLAMATION COST: <br /> <br />66 095 <br />Flle: E IOurayCO ldallasGrav 1112AmendAppl Z9 <br />07/27/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.