Laserfiche WebLink
<br /> <br />r ~ ` 1 • STl~T6 OF COl OuAUO vu u:,ni~ n~nu III III III III IIII III <br />t DEPAflTMENT OF NATURAL RESOURCES <br />g D. Moore Pascoe. Ezecu~ive Director <br />~,,- ~' 11i IN EU L.41V1) I{ F(:LAM A'I'I()\ <br />February 25, ]982 <br />423 Cenlen nial Buildiny, 1313 Sherman Street <br />~~ Denver, Colorado 80203 Tel. (303) 839-3567 <br />David C. Shelton <br />Director <br />Air. Vance Alflls <br />Trinidad Basin Mining, Inc. <br />P.O. Box 7R3 <br />Trinidad. Colorado 81082 <br />Re: Notice of Violation 1182-7 <br />Dear Vance <br />Enclosed is Notice of. Violation I! 82-7, issued to 'frinidad <br />Basin Mining for failure to maintain an adequate topsoil <br />buffer zone between disturbed and undisturbed areas, which <br />has resulted in a loss of available topsoil material. The <br />area in which this occurred is the box cut at the end of pit <br />112 next to the undisturbed drainage. <br />Please note that 'C BM has certain specific rights and oblig- <br />ations which are initiated with the receipt of this violation. <br />TBA1 must perform the abatement procedure outlined within the <br />notice of violation within the spec ifi.ed time. <br />TBM has the option of requesting a formal Board hearing as <br />outlined in tiro notice of. violation. <br />Within 15 days of the receipt of this notice, TBAf may submit <br />written information to the Division addressing the facts of the vio- <br />lation, which will be considered in determination of the proposed <br />civil penalty. <br />Within 30 days of the receipt of this notice the Division w.i]1 <br />determine if a civil penalty shall be assessed, and propose an <br />amount if a civil penalty is assessed. <br />