Laserfiche WebLink
<br />Mr. Thomas Ehmett, Acting Director -5- <br />Office of Surface Mining Reclamation <br />and Enforcement <br />April 21, 1995 <br />In light of the Rules referenced and the information provided in this response letter, the <br />Division does not believe the conditions cited in Part One or Part Two of Ten-Day Notice No. <br />X-95-020-179-001 TV-2 wazrant the issuance of enforcement action by the State of Colorado. <br />The Division believes that had these issues been discussed at the time of the March 8, 1995 <br />Phase I Bond Release Inspection, rather than through the process of the April 13, 1995 Ten- <br />Day Notice, these issues could have been adequately addressed at that time. We hope to <br />discuss any potential enforcement-related issues that arise during Oversight Inspections at mine <br />sites between Division and OSM personnel at the time of the inspection, in an effort to address <br />any potential problems immediately. <br />Please do not hesitate to contact us for any further assistance or information we may provide. <br />Sincerely,. <br />~.: <br />1 Y <br />J net ~ .Banns <br />vlro mental Protection Specialist <br />JHB/bjw <br />cc: Dan Hernandez, DMG <br />Susan McCannon, DMG <br />Allen S. Weaver, EFMC <br />M:\OSS\BJW\111B <br />