Laserfiche WebLink
'.ITTLE SILVER MINE' <br />• ;OND REEVALUATION • ' ..~ <br />CURRENT STATUS: <br />A $5,000 bond is p sted with the Colorlado Mined Land eclamation board. An <br />evaluation of need~e in 1981 by M.J. Spencer show d a need for a bond of <br />$6,100. We accepte the bond posted at the maximu available thru MLRB. This <br />evaluation will use t e latest available costs fr m our 1987 cost guide. <br />EXPECTED SITUATION: <br />Currently their are three buildings, two adi s, approximately 1.5 acres of <br />roads, and lots of miscell eous trash and d equipment and parts lying about <br />including parts of and bodi for at least three automobiles. A bond is needed <br />to insure removal of the bui ings, closi g and reshaping the adits and <br />associated area, and closure d revega tion of the access roads. <br />ESTIMATED COSTS: <br />REMOVING THE BUILDINGS <br />Burn all three buildings and haul <br />Apple 1 day <br />GS-4 2 day <br />GS-3 z aay <br />Burn fuel <br />mileage <br />D-4 cat 1/2 day @ $35 hr. x4 <br />(cat needed for fire proteq <br />a complete burn) / <br />Total Cost <br />AND <br />GS-4 8 Days <br />GS-3 8 days <br />1 ton truck 128 mi <br />Trailer use <br />Dump fees <br />to the dump. <br />and to help chunk piles to assure <br />x .23/mile x 8 days <br />$116 <br />110 <br />98 <br />5 <br />36 <br />$140 <br />$505 <br />$440 <br />392 <br />235 <br />50 <br />20 <br />Total cost / \ $1137 <br />