My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28106
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:30 PM
Creation date
11/21/2007 11:50:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
Enforcement
Doc Date
9/1/1996
Doc Name
NOTICE OF VIOLATION AND CEASE AND DESIST ORDER ALAMOSA PIT 2 ALAMOSA COUNTY PN M-83-175
From
SOUTHWEST READY MIX INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'.ITTLE SILVER MINE' <br />• ;OND REEVALUATION • ' ..~ <br />CURRENT STATUS: <br />A $5,000 bond is p sted with the Colorlado Mined Land eclamation board. An <br />evaluation of need~e in 1981 by M.J. Spencer show d a need for a bond of <br />$6,100. We accepte the bond posted at the maximu available thru MLRB. This <br />evaluation will use t e latest available costs fr m our 1987 cost guide. <br />EXPECTED SITUATION: <br />Currently their are three buildings, two adi s, approximately 1.5 acres of <br />roads, and lots of miscell eous trash and d equipment and parts lying about <br />including parts of and bodi for at least three automobiles. A bond is needed <br />to insure removal of the bui ings, closi g and reshaping the adits and <br />associated area, and closure d revega tion of the access roads. <br />ESTIMATED COSTS: <br />REMOVING THE BUILDINGS <br />Burn all three buildings and haul <br />Apple 1 day <br />GS-4 2 day <br />GS-3 z aay <br />Burn fuel <br />mileage <br />D-4 cat 1/2 day @ $35 hr. x4 <br />(cat needed for fire proteq <br />a complete burn) / <br />Total Cost <br />AND <br />GS-4 8 Days <br />GS-3 8 days <br />1 ton truck 128 mi <br />Trailer use <br />Dump fees <br />to the dump. <br />and to help chunk piles to assure <br />x .23/mile x 8 days <br />$116 <br />110 <br />98 <br />5 <br />36 <br />$140 <br />$505 <br />$440 <br />392 <br />235 <br />50 <br />20 <br />Total cost / \ $1137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.