Laserfiche WebLink
<br /> <br />(2> Resolution of the tailings cyanide concentration level <br />representations contained in its original approved permit and this <br />technical revision application. <br />(3) Documentation and elaboration of its statements that typical <br />tailings circuits contain 100 - 200 ppm free cyanide plus some WAD. <br />(4) Applicable cyanide concentration standards applied by other <br />~ regulatory jurisdictions. <br />BMG should submit this additional information no later than April 17, 1992. <br />Stipulation No. 2 <br />Pending approval by the Division of amended permissible cyanide concentration <br />levels for the tailings slurry, BMG shall continue "Cytox" treatment of the <br />tailings slurry within the tailings impoundment until the approved permit <br />cyanide concentration limitations of 4.4 ppm for total cyanide and ~.B ppm for <br />weak acid dissociable cyanide are achieved, or until the Division orders <br />cessation. <br />Stipulation No. 3 C~'tio4 ) <br />The proposed monitoring plan (Appendix V> shall be amended as follows: <br />Monitoring location 4 of the Technical Revision shall be amended to read <br />"4. At the outlet of the pipe delivering water from the tailings <br />underdrain system to the collection pond." <br />A Monitoring Location 5 shall be added "5. At all leak detection <br />monitoring points (leak detection points shall be sampled on a weekly <br />frequency)." <br />