My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28027
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:27 PM
Creation date
11/21/2007 11:48:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
4/28/1997
Doc Name
YOAST MINE C-94-082 NOV C-97-004
From
SENECA COAL CO
To
DMG
Violation No.
CV1997004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiuiiiiuiu iii • • <br />E~~A <br />S Coal Company <br />Seneca Coal Com <br />April 25, 1997 <br />RECEIVF~ <br />Mr. Jim Burnell <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Yoast Mine Permit C-94-082, NOV C-97-004 <br />Dear Mr. Burnell: <br />APR 2 ~ 1997 <br />O~VI510f1011d~n01&u ~• `.cam . i <br />This correspondence is a request for an extension of time for the <br />step 1 and 3 portions for abatement of NOV C-97-004 to the Yoast <br />Mine Permit C-94-082. The current abatement deadline for these <br />steps of the NOV is Wednesday, April 30th. <br />Step 1 of this NOV required Seneca to remove all sloughed fill <br />material from the channel of Annand Draw near culvert YB-6. Step <br />3 of the NOV was to complete the construction of the relief <br />drains on Yoast Haul Road A per the designs in the permit. <br />Because of the weather conditions and additional precipitation <br />the mine has received the first two weeks of April and this past <br />week as well, ground conditions have not changed much since the <br />NOV was issued in March. work did start cleaning up the material <br />near Annand Draw. As soon as the ground dries out and equipment <br />can work without causing further unnecessary damage, Seneca will <br />begin finishing these two projects. 2 am asking for a 30-day <br />extension of the current deadline to May 30th. <br />Should you or any other members of the Division have any <br />questions regarding this information, please do not hesitate to <br />contact me. <br />Sincerely, <br />7~~1~.P~.1~~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.