Laserfiche WebLink
<br />entitled "Memorandum of Understanding Between the Colorado Division of Minerals and <br />Geology and Battle Mountain Resources, Inc.;' dated (hereinafter referred to <br />as "MOU" and attached hereto as Exhibit C); (5) a document entitled "Battle Mountain <br />Gold Company -Contractor Safety Requirements" (attached hereto as Exhibit D); (6) all <br />accepted Change Orders; and (7) any Amendments. <br />I <br />1.2 Consultant shall provide, furnish and perform all necessary labor and services <br />and provide and furnish all necessary supplies, materials and equipment required to <br />complete the Work. <br />1.3 If Consultant is of the opinion that any service requested of ~t hereunder is <br />beyond the scope of the Work as provided in the Contract Documents, Consultant promptly <br />shall notify DMG and BMRI in writing of such opinion and the reasons for the same, with <br />specific references to the Contract Documents. No work or costs shall ~e incurred by <br />Consultant until written approval is received from DMG and BMRI. <br />1.4 No additional services beyond the scope of the Work as provided in the <br />Contract Documents shall be performed by Consultant unless BMRI shall, ~ writing, have <br />specifically directed such services to be performed, and a Change Order (herjeafter defined) <br />shall have been signed by BMRI and Consultant and approved by DMG. to the event of <br />-3- <br />