Laserfiche WebLink
Phase I Bond Release 5 Marr Strip Mine <br />720 Pit Area C-80-006 <br />EXHIBIT I <br />RE: Applicable Bond Amount for Phase I, 720 Pit, <br />Kerr Coal Company, Marr Strip Mine, Permit No. C-80-006. <br />I. DIRECT' COSTS <br />Task Description Cost ($) <br />1 Backfill 720 Pit $2,743,963 <br />la 720 Pit rd/ramp cost $ 32,959 <br />9 Remove material-main rd $ 2,579 <br />24 Topsoil 720 Pit Area 1 $ 25,270 <br />25 Topsoil 720 Pit Area 2 $ 30,031 <br />27 Topsoil 720 Stockpile 1 $ 8,246 <br />28 Topsoil 720 Stockpile 2 $ 12,028 <br /> SUBT. 720 Earthmoving $2,855,076 <br />SUBT. Marr Earthmoving $3,385,160 <br />Earthmoving cost for 720 Pit area is 84% of total bond amount associated with <br />earthmoving cost (720/Marr or 2855076/3385160 = 84%). Additional reclamation costs <br />for 720 Pit area figured as 84% of costs for total mine site. <br />Task Description <br />Cost ($) 84% Applicable <br />16 Final Grade $ 12,702 $ 4,306 ($12702/354 ac)(120 ac) <br />41 Floodlights, maintenance $ 183,166 $ 153,859 <br />42 Structural Demolition $ 108,114 NO CREDIT <br />43 Revegetation (tasks a-c) $ 101,618 $ 34,447 ($101,618/354 ac)(120 ac) <br />45 Mobilization/Demob. $ 40,116 NO CREDIT <br /> SUBTOTAL $ 445,716 $ 192,612 <br />