Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # : 102 <br />Date : 10/15/2007 <br />User : RCO <br />State :Colorado <br />PermiUjob # :M-1980-055HR <br />County :San Miguel Abbreviation :none <br />Site :Topaz Mrne Filename : MSHR-102 <br />Agency or organization name :DRMS <br />Permit or other job action :Conversion CN-1 <br />Task description :Excavate and backfil! vent collars <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 315C L <br />Horsepower: 110 <br />Weight (MT) : 16.90 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $22.91 NA Shift basis : 1 per day <br />Operating cosVhour : $28.54 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cosUhour : $84.41 Total fleet cosUhour : $84.41 <br />MATERIAL QUANTITIES ~ ~ <br />Initial Swell Loose <br />volume : 480 CCY factor : 1.165 volume : 559 LCY <br /> <br />Source of estimated volume :application (plus T-1) <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION - - - ~ ~- <br />Excavator CVCIe Time (load bucket swing loaded dump bucket swing emotvl <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description . AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.77 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock -Well blasted (60% - 75%) <br />Adjusted bucket capacity : 0.52 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,200 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shiWday) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 708.28 LCY/hour <br />Adjusted hourly unit production : 89.87 LCY/hour <br />Adjusted hourly fleet production : $g,$7 LCY/hour <br />JOB TIME AND COST - - -- ~~ <br />Fleet size : 1 excavator(s) Total job time : 6.22 hours <br />Unit cost : $0.939 per LCY Total job cost : $525 <br />