Laserfiche WebLink
<br />Drill rig availability is very limited. A rig is scheduled <br />to be on-site October 22 to drill and complete the two <br />additional wells. The next available rig cannot perform the <br />required work until late November. The Division's timely <br />reply to the proposed locations is requested. <br />If you have any questions, please call. <br />Sincerely, <br />~1Poy,4~ S~- <br />Alana L. Scott <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />