My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27956
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:24 PM
Creation date
11/21/2007 11:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
5/1/1985
Doc Name
SIGNED SETTLEMENT AGREEMENT
Violation No.
CV1985012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.; <br />iiiiiniiiiiiiuiii <br /> <br />DEPARTMENT OF NATURAL RESOURCES ~~1AY 11~ <br />Dwa K D~tcnK Enwwwthra Dlnelor <br />MINED LAND RECLAMATIO'I~''dl~~~`~'~( <br />o~vto c. srfEtroN, oineto. ~,o. ~ _ .. ~ ura Rrs9 <br />SETTLEMENT AGREEMENT <br />Rkmartl D. Lamm <br />oov~mor <br />Notice of Violation No. C-85-012 <br />Mine Name: FOIOEL CREEK MIME ~~ Permit No.: _C-056-8~ <br />Permittee: Twentymile Coal Company <br />Mailing Address: P.0. Box 897 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: ~~~ Routt Type of Mine: Underground, Private <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be ;1,250.00 ; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-1213(8)(nd). <br />DATE' 1~. ~ ~/ ; ~ WPn( .^'.!c \J~-I G' .~9w <br />r <br />By 7 ~ ~ ~ <br />DIVISION OF MINED LAND RECLAh1ATI0N <br />DATE: April 15, 1985 By <br />Conference Officer <br />C.R.S. 1973, 34-33-123(8)(c)(d) <br />(Rev. 8/83) <br />Doc. No. 5016 <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.